23
7 Electrical connection
7
Electrical connection
7.1
Preparing the electrical connection
Requirements:
•
Switch off the plant's voltage and secure it so that it cannot switch on again.
•
Correctly prepare the connections for the voltage supply and signal processing. The device must be
equipped with an electrical circuit that meets the requirements of DIN EN 61010-1 with regard to
"Limited-energy circuits".
•
Voltage supply: DC 18 to 30 V SELV, PELV.
•
Use a cable that has a temperature resistance suitable for the process.
•
Do not lay the cable near high-voltage or high-frequency cables; if you cannot avoid doing so, main-
tain a minimum gap of 30 cm.
7.1.1
Pin assignment of the M12 connector
Connection
Device
Connecting cable
a
Pin assignment and color coding
b
Figure
Voltage supply V+ (DC 24 V)
(1)
(1) – BN (brown)
I/O Pin 2
c
(2)
(2) – WH (white)
GND
(3)
(3) – BU (blue)
IO-Link, I/O Pin 1
d
(4)
(4) – BK (black)
Connection type
Plug connector M12
Plug connector M12 with screw lock-
ing
a
Connecting cable for plug connector M12
"Accessories", Page 44.
b
The color coding is only valid for A-coded standard cables!
c
Configurable as: Digital input, digital output, analog output
d
Configurable as: IO-Link, digital output, analog output
M12
M12
(3)
(4)
(1)
(2)
(3)
(4)
(1)
(2)
Summary of Contents for flowTRANS US W02
Page 2: ...Further information and downloads qr 406051 en jumo info...
Page 46: ...14 China RoHS 46...
Page 47: ......