6 Installation
22
6.2
Installing the device
1. Insert the O-rings supplied into
the sealing ring grooves in the
two process connections.
2. Install the device between the
two union ends of the mounting
set.
Ensure that the O-rings (2) be-
tween the process connections
(1) and union ends (3) are cor-
rectly positioned.
3. Manually screw union nuts on
both ends of the pipe to the pro-
cess connections on the device.
4. Switch on the plant, fill the pipe and check the tightness of the process connections under operating
conditions.
The device is now installed in the pipe.
(2)
(3)
(1)
Summary of Contents for flowTRANS US W02
Page 2: ...Further information and downloads qr 406051 en jumo info...
Page 46: ...14 China RoHS 46...
Page 47: ......