5.1
Commissioning
For safety reasons, the water treatment
devices must be vented immediately after
having been connected with the water
supply. Set the bypass valve supplied at the
setting "Operation" (see chapter “Mounting
of the Bypass Valve (accessories)”).
–
Turn on a water tap mounted after the
water treatment devices.
–
The power supply must be freely acces-
sible.
–
After the power supply has been
connected, the electrical circuit performs
a self-check of all the functions and
parameters stored in the electronics.
–
Following a successful check, all control
lamps flashes four times.
–
As soon as LED 1 shows a continuous
green light indicating "Operation", the
water treatment devices is ready for use.
When water is flowing, the green LED 1
flashes (see chapter “Control lamps,
manual pushbuttons”).
Electrical circuit
Connect the water treatment device
to the power supply. Plug the power
supply into the socket.
Fig. 9:
Electrical circuit
DIP switch
LEDs
Manual
pushbutton
1 5 m³
2 10 m³
3 20 m³
4 40 m³
5 Ox 1
6 Ox 2
7
8
1
5
VAC
B
a
tte
rie
M
1
Ele
kt
ro
d
e
S
3
H
a
ll
M
2
A
la
rm