JUDO BIOSTAT-COMBIMAT
11
Installation
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
The flange surface of the built-in rotary
flange must be in a vertical position! The
built-in rotary flange must be fitted thus that
mechanical stresses cannot occur! Other-
wise mechanical damages can arise at the
built-in rotary flange. This can lead to major
water damages.
In this case, people close to the water treat-
ment devices are exposed to a health risk
due to the large quantities of water.
Therefore, when mounting, ensure that no
large forces act on the pipe, built-in rotary
flange and water treatment devices.
4.2.4 Mounting of the Bypass Valve
(accessories)
The flange of the bypass valve marked with
the cast in letter “R” (pipe) is screwed onto
the built-in rotary flange. The conditioner is
fitted onto the flange marked with the cast in
letter “G” (unit). The hand-wheel of the
bypass valve can be positioned anywhere
above the unit or to the side if there is
enough space between the pipe and wall.
Depending on conditions on site, installation
should be carried out ensuring sufficient
access to the hand-wheel.
4.2.5 Fitting the wall support
Fig. 3:
Bypass valve
Fig. 4:
Wall support without bypass valve
„R“ pipe flange
„G“ unit flange
Built-in rotary flange
Hand-wheel
Wall support
< 12 Inch
(300 mm)