10
JUDO BIOSTAT-COMBIMAT
Installation
4.2
Requirements for the place of
installation
The room where the unit is installed must
be dry and frost free!
Unauthorised persons must not have
access to the water treatment device!
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
–
The ambient temperature must not
exceed 86 °F (30 °C)! At higher
temperatures or direct sun radiation the
material can be damaged.
–
We recommend that the water treatment
devices is installed after a backwash
protective filter, to prevent particles of
dirt and sand being swept in.
–
Length of the power lead is approxi-
mately 60 Inch (1.5 m).
–
Particularly in the case of small cross-
sections and soft pipe materials, the
water pipes should be supported in the
vicinity of the connecting flange with two
pipe-clamps.
4.2.1 Installed position
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
Always install the water treatment devices
in a vertical position (± 5°)!
Unless, impairments of its function can
occur.
4.2.2 Power supply
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
A permanent power supply must be avail-
able. If the water treatment devices is not
permanently supplied with power, there is
no warning in case of faults, and no water is
treated.
4.2.3 Mounting the built-in rotary
flange
The built-in rotary flange is used as a
connecting element between the pipe and
the water treatment device.
It is suitable for both, -horizontally and verti-
cally mounted pipes.
The built-in rotary flange must be
installed in the direction of flow. This is
marked by a cast in arrow (see Fig. 1).
If these instructions aren't respected, the
water treatment device doesn't work.
A power connection (120 V, 60 Hz),
which has to be permanently
under voltage, must be available.
A splash proof socket is required
for the power supply, in accord-
ance with the legal regulations for
wet rooms.