JUDO BIOSTAT 25 TGA
13
Operation
5.
Operation
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
Always observe the chapter “Intended Use”!
5.1
Commissioning
For safety reasons, the water treatment
device must be vented immediately after
having been connected with the water
supply.
–
Set the bypass valve (if mounted) to the
setting “Operation”.
–
Turn on a water tap mounted after the
water treatment device.
–
The power supply must be freely acces-
sible.
After the power supply has been connected,
the electrical circuit performs a self-check of
all the functions and parameters stored in
the electronics.
Following a successful check, all control
lamps flashes four times.
As soon as LED 1 shows a continuous
green light indicating “Operation”, the water
treatment device is ready for use. When
water is flowing, the green LED 1 flashes
(see chapter “Control lamps, manual push-
buttons”).
Electrical circuit
Connect the water treatment device
to the power supply. Plug the power
supply into the socket.
Fig. 7:
DIP switch
LEDs
manual
pushbutton
1 5 m³
2 10 m³
3 20 m³
4 40 m³
5 Ox 1
6 Ox 2
7
8
15
VAC
bat
ter
y
Ba
tter
ie
M
1
el
e
ctr
ode
El
ek
trode
S3
H
a
ll
M
2
al
ar
m
A
la
rm