4-3
4.1.3 Using Electronic Bearing Line (EBL1/EBL2)
Electronic bearing lines (EBL) are indispensable to the measurement of bearings.
Operators must be familiar with the operation of EBL beforehand.
The system is equipped with two EBL. The bearing and starting point of an EBL can be operated
separately from the other EBL.
An intersection marker is displayed at the intersection point of the EBL and VRM of the same
number.
Intersection markers shown on EBL:
: EBL1, VRM1
: EBL2, VRM2
EBL Bearing Display
The bearing value of the current EBL1 or EBL2 on the PPI display is shown in the
EBL1/2 bearing (upper right of the display on page 2-3). The currently operable
EBL1 or EBL2 is highlighted in the EBL1/2 adjustment (upper right of the display
⑤
/
⑦
on page 2-19).
Starting Point of EBL
The starting point of the currently operating EBL can be switched from the center of
the radar display to any offset position . The offset position of the EBL starting point
can be fixed on the radar display or at the latitude and longitude. (The setting of the
navigator is necessary for fixing the offset position at the latitude and longitude.)
Summary of Contents for JMA-5912-6
Page 2: ......
Page 17: ...xi NKE 2103 6 Scanner Unit NKE 2254 7 9 Scanner Unit Warning Label Warning Label...
Page 18: ...xii NKE 1130 Scanner Unit NQE 3151A Junction Box Warning Label Warning Label...
Page 19: ...xiii NQE 3141 4A 8A Interswitch Unit NBA 5111 Power Supply Warning Label Warning Label...
Page 20: ...xiv NQE 3167 Power Control Unit Warning Label...
Page 22: ...xvi Scanner Unit Type NKE 2254 9 9 feet NDC 1477 Radar Process Unit Desktop Type...
Page 23: ...xvii NWZ 170 Monitor Unit Desktop Type NCE 5171 Operation Unit Desktop Type...
Page 40: ......
Page 48: ...1 7 Fig 1 1 Outside Drawing of NKE 2103 6 SCANNER UNIT...
Page 49: ...1 8 1 4 Exterior Drawings y 1 Fig 1 2 Outside Drawing of NKE 2254 7 SCANNER UNIT...
Page 50: ...1 9 Fig 1 3 Outside Drawing of NKE 2254 9 SCANNER UNIT...
Page 51: ...1 10 1 4 Exterior Drawings y 1 Fig 1 4 Outside Drawing of NKE 1130 SCANNER UNIT...
Page 52: ...1 11 Fig 1 5 Outside Drawing of NWZ 170 MONITOR UNIT Option...
Page 54: ...1 13 Fig 1 7 Outside Drawing of NDC 1477 RADAR PROCESS UNIT...
Page 55: ...1 14 1 4 Exterior Drawings y 1 Fig 1 8 Outside Drawing of NCE 5171 OPERATION UNIT...
Page 56: ...1 15 Fig 1 9 Outside Drawing of NQE 3151A JUNCTION BOX...
Page 57: ...1 16 1 4 Exterior Drawings y 1 Fig 1 10 Outside Drawing of NQE 3141 4A INTERSWITCH UNIT Option...
Page 58: ...1 17 Fig 1 11 Outside Drawing of NQE 3141 8A INTERSWITCH UNIT Option...
Page 60: ...1 19 Fig 1 13 Outside Drawing of NQE 3167 POWER CONTROL UNIT Option...
Page 68: ...2 3 Lower left of the display Upper right of the display...
Page 242: ......
Page 328: ...7 9...
Page 384: ......
Page 402: ......
Page 421: ...APPENDIX...
Page 422: ......
Page 438: ...32bit bus BP BZ VD TI MTR PWRCNT P12V 12V RGB Fig 2 Block Diagram of JMA 5932 12 RADAR...
Page 442: ...Fig 6 Terminal Board Connection Diagram of RADAR and INTERSWITCH Unit Option...
Page 443: ...Fig 7 Power System Diagram of JMA 5912 6 JMA 5922 7 9 RADAR...
Page 445: ...Fig 9 Internal Connection Diagram of NDC 1477 RADAR PROCESS UNIT...
Page 446: ...Fig 10 Internal Connection Diagram of NQA 2123 INTERFACE UNIT...
Page 447: ...Fig 11 Internal Connection Diagram of NCE 5171 OPERATION UNIT...
Page 465: ......