5-7
TAIL BOOM CARRIER INSTALLATION
5-8
TAIL BOOM ASSEMBLY INSTALLATION
30
3mm Lock Nut
........6 pc
3x15mm Socket Head Bolt
........4 pc
3x40mm Socket Head Bolt
........2 pc
* Do not fully tighten at this time. These bolts will
be secured in Step 5-10.
Slide the Tail Boom through the Tail Boom Carrier and
engage the Tail Drive Belt over the Front Pulley. Be
certain to note the correct rotation (direction shown
below. Set the belt tension per the directions below.).
Note:
It may be necessary to add one thickness
of electrical tape around the end of the Tail
Boom to insure positive attachment to the
Tail Boom Carrier.
Secure Bolts completly
after inserting Tail Boom
making sure that the
Tail Output Shaft is
exactly 90° to the
Main Rotor Shaft.
Rotate the Tail Drive Belt in the direction shown before
installing it onto the front pulley. It is extremely
important to install the belt in the proper direction to
insure correct rotation of the Tail Rotor Blades.
Belt tension should be set so when pressing with your
finger, both sides of the belt do NOT come in contact
with each other. Be sure not to set the belt too tight,
as this can cause vibration and a loss of power.
3mm Lock Nut
3mm Lock Nut
Tail Boom Carrier (L&R)
*3x15mm Socket Head Bolt
*3x40mm Socket Head Bolt
Tail Output
Shaft Pulley
Front Pulley
Summary of Contents for ERGO .32
Page 66: ...Heli Division Revised 3 4 97...