9
139472_Rev_B 8.28.12
Figure 6. The leveling bolts should not be extended
further than 1/2”.
Figure 7. The bolt mounting brackets may be
extended up to 2 1/2”. With maximum extension of
both bolts and brackets, the firebox may be raised a
total of 3”.
Leveling Bolt
Mounting
Brackets
Mantel and Top Trim Clearances
Measure clearances from the finished floor of the fire-
place opening.
A:
53 1/2” (1359 mm)
B:
52”
(1321 mm)
C:
50 1/2” (1283 mm)
D:
49”
(1245 mm)
E:
47 1/2” (1207 mm)
F:
45”
(1143 mm)
NOTE: CLEARANCES MAY BE REDUCED BY 2 INCHES IF
THE RISER BAR IS NOT USED.
Figure 5. Baseline Mantel and Trim clearance requirements.
The insert is raised 2” on the leveling brackets.
Leg Leveler Bolts and Brackets
This feature enables greater installation flexibility
beyond eliminating problems caused by irregularities
in the hearth floor.
The leveling bolts may be extended from the
mounting brackets no more than 1/2”. See fig. 6.
The firebox may be further raised, in 1/2” incre
-
ments, up to 2 1/2” more (max. 3” total) by adjusting
the height of the leveling bolt mounting brackets. Fig. 7.
Clearance to Combustibles
When raising the firebox up to 2”, mantel and hearth
clearances remain unchanged from those specified in fig. 5.
NOTE: IF RAISING THE UNIT GREATER THAN
TWO INCHES, ADD ONE INCH TO THE BASELINE
CLEARANCES SPECIFIED ABOVE.