EG0LD-1000 Electronic Grease Level Detector
Installation and Operating Procedures
__________________________________________________________________________________________
Page 6
2.2 Control Unit Installation
The Control Unit has integral mounting brackets for wall mounting.
Install the Control Unit as follows:
1) Find a wall location that is within 10 feet of the interceptor and within 5 feet of an 115VAC
wall outlet.
2) Place the Control Unit on the wall and mark the two (2) mounting hole locations. Drill 3/16”
holes to accept the mounting hardware.
3) Use the mounting hardware provided to fasten the Control Unit to the wall.
4) Plug the power module provided into the wall and plug the power module cord into the
Control Unit. Note: The LED indicators should flash ON then OFF when the unit is properly
powered.
See Appendix II for optional remote level alarm installation procedure.
See Appendix III for optional Modem installation procedure.