background image

EG0LD-1000 Electronic Grease Level Detector

                                              

    

                                         

 

Installation and Operating Procedures 
__________________________________________________________________________________________ 

 

 

Page 18 

 

 

Appendix III 

Optional Modem Unit 

 
 

Optional Modem Unit Installation 

 
The following items are provided with EGOLD1000 installation kit when the Optional Modem Unit 
is provided: 
 

 

An external Modem Unit including installation and operating procedures.  

 

A U.L. approved wall mount low voltage power module. 

 

A cable to interconnect the Modem Unit to the wall mounted Control Unit. 

 

A telephone cable to connect the Modem unit to the telephone line. 

 

 
Install the Modem Unit as follows: 

 
1)

 

Find a location that is within 15 feet of the Control Unit, within 5 feet of an 115VAC wall 
outlet and within 5 feet of a telephone jack to place the Modem Unit provided. 

 
2)

 

Plug the jack connector of the modem cable provided into the Control unit and the “D” 
connector of the modem cable into the rear of the Modem Unit.  

 

3)

 

Plug the telephone cable into the “line” connector on the rear of the Modem Unit and the 
telephone jack. 

 

4)

 

Plug the power module provided into the wall and plug the power module cord into the 
Modem Unit. 

 

5)

 

Turn the Modem Unit ON as indicated in the operating procedures provided.

 

 

6)

 

Cycle the power to the Control Unit. The “RX” and “TX” indicators on the Modem Unit 
should flicker. Note: This indicates the Control unit is communicating to the Modem Unit.

 

 

7)

 

Contact JOSAM when the installation is complete. JOSAM will perform a test of the remote 
grease level monitoring function. 

 

Summary of Contents for EGOLD-1000

Page 1: ...000 Electronic Grease Level Detector Installation and Operating Procedures Josam Company 2501 South Front Street Philadelphia PA 19148 215 339 5370 WARNING Cancer and Reproductive Harm www p65warnings...

Page 2: ...EGOLD 1000 CONTROLS AND INDICATORS 9 4 0 EGOLD 1000 CALIBRATION 11 5 0 EGOLD 1000 OPERATION 13 6 0 EGOLD 1000 MAINTENANCE 15 Figures FIGURE 1 1 ILLUSTRATES THE E LECTRONIC GREASE LEVEL DETECTION SYST...

Page 3: ...nted Control Unit and the Tank Probe assembly The Control Unit GLS housing connectors control switches and indicators are water resistant for splash or spray conditions The Tank Probe assembly is a se...

Page 4: ...EG0LD 1000 Electronic Grease Level Detector Installation and Operating Procedures __________________________________________________________________________________________ Page 4 Figure 1 1 MODEM...

Page 5: ...20 inches will require Tank Probe assembly part number MA47 18 Note For inside tank wall heights greater than 22 inches consult JOSAM for the proper Tank Probe assembly part number Prior to mounting t...

Page 6: ...rceptor and within 5 feet of an 115VAC wall outlet 2 Place the Control Unit on the wall and mark the two 2 mounting hole locations Drill 3 16 holes to accept the mounting hardware 3 Use the mounting h...

Page 7: ...th the 20 screw and wing nut provided Bracket B should be free to slide up and down on bracket A Attach the probe to the underside of bracket A with the 20 screw provided Slide the probe and bracket B...

Page 8: ...el Detector Installation and Operating Procedures __________________________________________________________________________________________ Page 8 Figure 2 1 STATIC WATER LEVEL OUTLET BRACKET A BRACK...

Page 9: ...stem is operating properly in the grease level detection mode Calibration LED When ON this LED indicates that the EGOLD 1000 Electronic Grease Level Detector system is in the grease level calibration...

Page 10: ...or Installation and Operating Procedures __________________________________________________________________________________________ Page 10 2 5mm POWER JACK CENTER POSITIVE MOUNT USING 8 HARDWARE PROV...

Page 11: ...eptor tank wall that is approximately 1 3 of the distance from the bottom of the outlet pipe to the bottom of the tank Note When grease fills the interceptor tank down to this level the alarm will be...

Page 12: ...interceptor tank with water until water flows out of the interceptor tank outlet pipe 10 Press the Cal Set Button on the Control Unit The two 2 Green LEDs will begin flashing After several minutes the...

Page 13: ...he Yellow LED indicates the grease volume is approaching the level required for cleaning the grease interceptor tank The Red LED indicates the grease volume has reached the level requiring the grease...

Page 14: ...operating errors as follows The Operating LED will be OFF The Red Level LED will be flashing The audible Alarm will sound intermittently short beeps once every ten seconds System errors include Loss o...

Page 15: ...be cleaned every time the grease is emptied from the interceptor tank As a minimum the tank probe should be cleaned every 6 months Tank probe cleaning can be accomplished by wiping the probe with a s...

Page 16: ...onic Grease Level Detector Installation and Operating Procedures __________________________________________________________________________________________ Page 16 Appendix I Tank Probe Assembly Mount...

Page 17: ...00 Electronic Grease Level Detector Installation and Operating Procedures __________________________________________________________________________________________ Page 17 Appendix II Optional Alarm...

Page 18: ...hat is within 15 feet of the Control Unit within 5 feet of an 115VAC wall outlet and within 5 feet of a telephone jack to place the Modem Unit provided 2 Plug the jack connector of the modem cable pro...

Reviews: