8
• Keep the ventilation grids in the area the appliance is installed in clean conditions.
• Do not burn any fuel except wood.
• Check and periodically clean the fume exhaust pipe, from the appliance to the flue (Union).
• It is strictly prohibited to start up the product with the combustion chamber door open or allow it to run with the glass broken.
• In case of need and if any operating problems persist, the user should contact the specialised Technical Assistance Center.
• Never try to kindle the fireplace by means of ethyl alcohol or any other flammable liquid product.
02.3
SAFETY REGULATIONS FOR EXTRAORDINARY MAINTENANCE AND INSTALLATION
• The user and/or owner of the product is required, in accordance with the laws in force, to assign the installation and
maintenance to qualified and specialised operators, and acknowledge the risks and hazards should they fail to observe
this requirement.
• The installation of the heat generator and the relative combustion product exhaustion system, the electrical connections,
the commissioning and extraordinary maintenance services MUST always be performed by qualified and licensed
professional staff.
• The product must be installed in accordance with the laws and standards in force in the State, Region or Area in which
the machine is installed.
• The system installer MUST issue a Declaration of compliance for the work performed after commissioning the system,
in accordance with the laws in force related to system safety standards.
• The installation technician must inform the user on safe equipment use.
• The installation operator is responsible for the installation and is therefore required to perform the work to top workmanship
standards.
• The appliance must be connected to a combustion product exhaustion flue built in accordance with applicable
standards and certified with a declaration of compliance.
• Should any installation defects arise during the optional Commisisoning service, the specialised Technical Service Center,
can refuse to endorse use of the product for safety reasons and submit a written Servicing Report to the User informing
him that he and the Installation operator shall be jointly liable for any damage to persons, animals or things if used.
• Before installing the machine, the customer and installation operator must ensure that the flooring on which it will be
positioned is suitably levelled and can support the weight (see
CHAP.06 - TECHNICAL DATA
). IIf there is any doubt
on the solidity of the flooring, it is essential to have a Structural Engineer verify relative installation feasibility.
• Only specialised and qualified personnel may work or carry out checks inside the machine, complying with safety
regulations.
• Prior to installation, the user and installer are obliged to check that the mains electrical supply to which the machine will be
connected, corresponds to the voltage on the identification plate (see
CHAP.05.2 - PRODUCT IDENTIFICATION
),
check that the system is sized so as to bear the maximum load required of the product, and also that it is equipped with
all suitable safety devices to classify the electrical system as COMPLIANT with applicable safety standards. If this is not
the case, contact a Qualified Technician to adapt the system to required standards.
• The power cord plug must be connected only AFTER the conclusion of the installation and assembly of the device, and
must remain accessible after installation if the device does not have a suitable and accessible double-pole switch.
• Personnel assigned to handling the machines and equipment must always wear industrial gloves and boots.
• The Maintenance Operator must recommend the Customer to sign an annual maintenance contract for the product, so
as to maintain the levels of safety and efficient performance of the product.
• The Maintenance Operator must check the working hours of the product between one maintenance intervention and
another, to verify the actual work load of the machine. The actual hours of operation shall be reset at the end of the
Technical intervention and indicated on the Servicing Report.
Summary of Contents for QL10
Page 31: ...ENGLISH NOTES 31...