About this NION
Environmental Requirements
8
NION-16C48M Installation & Operation Manual - P/N: 53347:Rev: A1 5/5/09
Canada
•
CSA C22.1
—Canadian Electrical Code, Part I, Safety Standard for Electrical Installations
1.2 Environmental Requirements
This product must be installed in the following environmental conditions:
•
Temperature range of 0°C to 49°C (32°F - 120°F).
•
93% humidity non-condensing at 30°C (86°F).
1.2.1 Mounting Location Requirements
This NION is designed for wall installation and must be installed in the same room within 20 feet
of the Fire Alarm Control Panel (FACP) it is monitoring. It may be mounted either in a cabinet
with the FACP or in a separate cabinet. All of this NION’s wiring must be in conduit. All wiring
connections are supervised and power limited. In Canada, if the NION is installed in a separate
cabinet, the cabinet must be connected to the FACP with a close nipple fitting. The type of
hardware used is at the discretion of the installer, but must be in accordance with local code
requirements.
1.3 Related Documentation
The following is a list of documentation resources related to the Intelligent Fire Integrator™
system.
•
Intelligent Fire Integrator™ JNFN GW Embedded (P/N 53138)
•
Intelligent Fire Integrator™ JNFN GW PC (P/N 53097)
•
Intelligent Fire Integrator™ Johnson Controls Echelon Gateway (P/N 53096)
•
Intelligent Fire Integrator™ NION-2C8M (P/N 53346)
•
Intelligent Fire Integrator™ NION-16C48M (P/N 53347)
•
Intelligent Fire Integrator™ NION-EST2 (P/N 53349)
•
Intelligent Fire Integrator™ NION-EST3 (P/N 53345)
•
Intelligent Fire Integrator™ NION-Simplex 4010 (P/N 53351)
•
Intelligent Fire Integrator™ NION-Simplex 4020 (P/N 53352)
•
Intelligent Fire Integrator™ NION-Simplex 4100 (P/N 53353)
•
Intelligent Fire Integrator™ NetLogic (P/N 53095)
•
Intelligent Fire Integrator™ Configuration Tool (P/N 53380)
!
WARNING: Installation
Improper installation, maintenance, and lack of routine testing could result in system malfunction.
NOTE:
The contents of this manual are important and must be kept in close proximity of the IFI
Workstation (Workstation). If building ownership is changed, this manual including all other
testing and maintenance information must also be passed to the current owner of the facility. A
copy of this manual was shipped with the equipment and is also available from the manufacturer.