22
Driving cardan
Check and adjust if necessary, the cardan length (2)
according to the instructions on page 45 and then hitch
it to the tractor’s TDP.
To couple the cardan just press the pin, fit in and push
the cardan over the PTO shaft until the pin springs. See
the side scheme.
a) Lift the machine up to 15 cm from the ground.
b) Retract the stand jack (1).
c) Check whether the machine is parallel in relation to
the ground.
d) Lower the machine and make adjustments in case
there is need, adjusting the intermediate arms length of
the hydraulic hitch.
Pin pressed
Tractor’s PTO
Tail shaft
Pin released
5.2- Transversal leveling
5.3- Longitudinal leveling
1
Check the aligners (2) position in relation to the ground,
and in case there is need, adjust the length of the top
link of the hydraulic hitch.
2
Summary of Contents for C-40 S2
Page 2: ......
Page 14: ...2 3 General Adesive Labels Transmission box version Belts version 14...
Page 56: ...56 11 Additional Information 11 1 Key Gauge Table 11 2 Torque Table N mTorque Unit...
Page 58: ...58...
Page 60: ......
Page 61: ......
Page 74: ...2 3 Adhesivos generales Versi n con caja de transmisi n Versi n con correa 14...
Page 118: ...58...
Page 120: ......
Page 121: ......
Page 123: ......