INSTALLATION INSTRUCTION
©2017 Jetta Corporation
.
All rights reserved. REV 01/2017
1.
Bathtub must be set on a solid flat surface and leveled in both directions. (All six (6) adjustable feet must come in contact
with the floor). Bathtub MUST be leveled using a 2’ – 0” level both ways on the top deck of the Bathtub only.
2.
Plumbing hardware (fill valve, hoses, and reverse drain) should be installed prior to setting tub in-place.
3.
Use union connections only for the pump. Do not overtighten. Make sure the O-rings on the pump are in place. Hand tighten
pump fittings. Do not use a wrench, channel locks, or pipe dope (teflon paste).
4.
The Filler / Extension panel(s) are used to extend the overall Bathtub to 60”.
5.
The Door Drain fitting (precut to fit) is to be installed between the drain shoe and the Waste & Overflow tee
–
or- in reverse drain application, between the waste and overflow piping.
WASTE & VENT SYSTEM:
For optimum drain performance, it is recommended to replace the trap arm and vent tee with a 2” x 1 ½” x 2” vent tee and a
2” trap arm with a 2” ‘P’ trap and 1 ½” bushing. If this is not possible, replace the existing 1 ½” trap arm and ‘P’ trap. If
neither of the above options is possible, it is critical to ‘Roto Rooter’ or snake out the ‘P’ Trap and trap arm for at least 10’-0”
from the ‘P’ trap.
WALK IN BATHS