Installation & Operation manual of Jetmaster Vent Free Drop In Fireplace
Page 11
Revision 02 @ 04/09
STEP 7
Place a row of pebbles directly above the burner opening between the front and back V-board panels. These
pebbles must be spaced
10mm – 15mm
apart. Pay attention to the pebbles placed in front of the pilot flame, so
that the pilot flame will not be obstructed by any pebble.
Now cover the rest of the panels with pebbles in a visually acceptable manner.
NOTE:
The pebbles must always remain on one level only. Do not place any pebble on top of any other pebble,
except for the edges of the fray where flames cannot reach.
COMMISIONING
At this stage of the installation the unit have already been tested for any gas leaks and for the correct dynamic gas
supply pressure to the unit. Should there be any doubt about leaks or the supply pressure, remove all pebbles, &
V-Board panels and repeat the checks as described in this manual.
INCORRECT PEBBLE PLACEMENT WILL RESULT IN
UNACCEPTABLE AND POTENTIALLY DANGEROUS CONDITIONS.
NEVER SUBSTITUTE THE PEBBLES, GLASS OR GRANULAR VERMICULITE
WITH ANYTHING OTHER THAN WHAT IS SUPPLIED BY JETMASTER
Summary of Contents for DROP IN 1020
Page 1: ......