Re-install the acrylic onto the marquee. It is easier to get a few screws
started in multiple locations first so that the acrylic is lined up
properly.
Check to make sure all electrical connections to the 5 horizontal LED
lights are secure and did not come loose during shipping.
Check Box When This Step is Complete
Step # 13-Q
Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Step # 13-O
Connect the wires to the receiving connector inside Section # 4.
Check Box When This Step is Complete
Step # 13-P
Jennison Entertainment Technologies
Ocean Pearls Service Manual
Page 49