Step # 6-C
Insert and tighten the remaining bolts into the elevator.
Check Box When This Step is Complete
Step # 6-D
After the elevator is installed, check the clearance of the metal ball
supports and ensure they do not hit the acrlyic bridge in the upper
holding area. This is the acrylic structure the sinle ball sits in just
before being loaded into the claw. You may want to manualy rotate
the elevator several times to check on the clearance. If they do hit,
you may need to loosen the elevator bolts, re-adjust, and then re-
tighten.
Check Box When This Step is Complete
Step # 6-E
Plug the 4 Pin Molex for the motor into the receiving harness.
INSTALLATION INSTRUCTIONS
Check Box When This Step is Complete
Jennison Entertainment Technologies
Ocean Pearls Service Manual
Page 34