Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Step # 15-F
Check the alignment of the dome and ensure it is centered.
Check Box When This Step is Complete
Step # 15-G
Locate and remove the foam packaging from the acrylic shell top.
Check Box When This Step is Complete
Step # 15-H
On each of the four bolts, there are two nuts. Remove the top nut
from each bolt and leave the bottom nut securly in place.
Jennison Entertainment Technologies
Ocean Pearls Service Manual
Page 55