3
6 Turbine Starting ............................................................................................................................... 27
6.1 Preparing the Turbine for Installation ............................................................................................................... 27
6.2 Important notes .......................................................................................................................................................... 27
6.3 Priming ........................................................................................................................................................................... 28
6.4 First engine runs ......................................................................................................................................................... 29
6.5 Starting procedure ..................................................................................................................................................... 29
6.6 Engine shut down procedure ................................................................................................................................. 30
6.7 What to do in case of an Emergency .................................................................................................................... 30
7 Fuel, Oil and Fuel System Care .................................................................................................... 30
7.1 Recommend Fuel ........................................................................................................................................................ 30
7.2 Recommend Oil ........................................................................................................................................................... 30
7.3 Fuel Filter ...................................................................................................................................................................... 31
7.4 Header Tank ................................................................................................................................................................. 31
7.5 Fuel Line ......................................................................................................................................................................... 31
7.6 Tanks ............................................................................................................................................................................... 31
8 Multiengine Installation ................................................................................................................ 31
9 Maintenance ...................................................................................................................................... 31
10 Troubleshooting ............................................................................................................................ 32
11 Optional Accessories .................................................................................................................... 33
11.1 S-Bus Pitot speed sensor ....................................................................................................................................... 33
11.2 S-Bus Turboprop RPM sensor ............................................................................................................................. 33
11.3 S-Bus Telemetry adaptor ...................................................................................................................................... 33
12 Jet Central BB Software ............................................................................................................... 33
12.1 Introduction ............................................................................................................................................................... 33
12.2 Using the application .............................................................................................................................................. 34
12.3 Dynamic Graphics .................................................................................................................................................... 35
13 Turbine Quick Start Guide ......................................................................................................... 35
14 Safety Tips ........................................................................................................................................ 36
15 Lifetime Turbine Warranty ....................................................................................................... 37
16 Worldwide Network ..................................................................................................................... 38
Appendix A: Thrust Graph ................................................................................................................ 39
Appendix B: Mounting Dimensions ............................................................................................... 39
Appendix C: Pipe Gaps ....................................................................................................................... 40
Summary of Contents for Rabbit KS 100 SE Series
Page 1: ...Revision 0 2 February 2016 SE series ...
Page 14: ...13 4 Turbine System ...
Page 40: ...39 Appendix A Thrust Graph ...
Page 42: ...41 Appendix C Pipe Gaps ...