Section II: Operation
Page 46
5-376-000086
REV. 4 - 07/10
11. With the wire rope tight, slowly
wind it in, observing both the work
and the drum. Be sure the wire
rope strands do not cross wrap
or criss-cross on the drum.
Observe the path the work must
travel for snags or obstructions
which could stall the movement
and overload the wire rope.
12.Once the work is in the desired
position, apply the towed vehicles
parking brake or use blocks or tie
the work down if there is any
question about stability. Slowly
reduce the wire rope tension.
After enough wire rope has been
unwound, you may remove the
hookup.
Summary of Contents for MPL40
Page 2: ...5 376 000086 REV 4 07 10 ...
Page 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...