Section II: Operation
Page 43
5-376-000086
REV. 4 - 07/10
2. Position and align the truck to
obtain as direct a pull as possible.
Straight line pulls are the best and
most efficient.
3. Set the brakes on your Jerr-Dan
unit.
4. Unfold the under lift boom.
5. If a heavy lift or pull is to be made
additional lines may be
necessary. Always use more
stabilizing lines than pull lines.
RIG FOR SAFETY. The use of
scotch blocks is also
recommended.
6. Unhook the wire rope cables from
the top of the tow sling.
Summary of Contents for MPL40
Page 2: ...5 376 000086 REV 4 07 10 ...
Page 8: ...5 376 000086 REV 4 07 10 Page iv THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 26: ...Section I Safety Page 18 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...Section II Operation Page 72 5 376 000086 REV 4 07 10 THIS PAGE INTENTIONALLY LEFT BLANK ...