406, 407 & 409
8
9
Please see operator manual for full details.
REFER TO OPERATORS MANUAL TRANSPORTING MACHINE
Machine Transport Proceedure
Operation
Lifting a Machine
110
110
9821-9350-5
T023880-9
Fig 83. Lifting Points
A
A
Lifting Points
Operation
Transporting The Machine
105
105
9821-9350-5
T070350-37
Fig 77. Tie Down Label Locations
T070350-27
Fig 78. Front Axle
T070350-28
Fig 79. Rear Axle
F
F
F
F
Operation
Transporting The Machine
105
105
9821-9350-5
T070350-37
Fig 77. Tie Down Label Locations
T070350-27
Fig 78. Front Axle
T070350-28
Fig 79. Rear Axle
F
F
F
F
Operation
Transporting The Machine
105
105
9821-9350-5
T070350-37
Fig 77. Tie Down Label Locations
T070350-27
Fig 78. Front Axle
T070350-28
Fig 79. Rear Axle
F
F
F
F
Operation
Transporting The Machine
106
106
9821-9350-5
T070350-26
Fig 80. Tie Down Restraint Angles
A
A
D
E
B
B
B
B
E
E
E
C
D
C
Operation
Transporting The Machine
106
106
9821-9350-5
T070350-26
Fig 80. Tie Down Restraint Angles
A
A
D
E
B
B
B
B
E
E
E
C
D
C
A
Restraint Angular Range 8° to 11°
B
Restraint Angular Range 40° to 50°
C
Front axle
D
Rear axle
E
Tie Down Restraint
F
Tie Down Point
Front Axle
Tie Down Point Decal
Rear Axle
Note:
These Measurements are based on
a 2500mm wide trailer bed. The correct Tie
down points are Identified by their Labels.
To Lift the Machine
1.
All attachments need to be removed
2.
Lower Boom
3.
Remove all loose Items from machine
4.
Check Un-laden weight
5.
Use ONLY indicated Lift points (A)
6.
Ensure the machine Is Balanced.
Fig 4
Fig 5
Fig 6