Jason International, Inc. •
501.771.4477
Page 2 of 15
Customer Service : 800.255.5766
Copyright © 2010 Jason International.
INSTALLATION
Remove the product from its packaging.
Read the entire
instructions prior to installing this product.
See USER MAINTENANCE INSTRUCTIONS on page 13 for humidity
and mold prevention suggestions prior to Installation.
1.
Remove the packing board from the skirt
by placing the bath
and skirt assembly upside down and remove the four
press-in fasteners.
See Figure1.
CAUTION: Place bath deck on a surface that will not scratch the
acrylic surface of the bath.
2.
Disassemble the bath from its skirt
by removing the four nuts
and washers located at the bottom of the bath with a 1/2”
open ended wrench. Lift the skirt out of the bath. Place
the skirt and the bath in an upright position next to each
other.
See
Figure 1.
3.
Set aside the template, tubing with 2 clamps,
and locating stud
kit,
these will be used later.
4.
Blower Carton.
Remove the blower with stand, check valve,
and remote control (when supplied) from the separate
blower carton.
5.
Key Pad and Sani Design Cleaning System Kit
. Set aside to
be installed later.
6.
Cardboard bath-well protector.
Each bath is provided with a
cardboard bath-well protector that should be kept in the
unit throughout the bathroom construction process.
Note:
Overflow drains, fill spouts, and valves must be
installed according to the instructions herein.
7.
Installation template.
An installation template is provided to
locate the floor drain position, sump area position, remote
blower-tubing floor cutout position, water inlet stub-out
position, and skirt center lines. Tape the template to the
sub-floor in the desired location.
8.
Mark on the sub-floor
the sump area position, the water
inlet stub-out position, and the remote blower-tubing floor
cut out position. One remote blower tubing, floor cutout
position and four (4) water inlet stub-out positions have
been indicated on the template. Choose the water inlet
stub-out position that is preferable for your installation.
9.
Remove the template and cut out the floor.
CAUTION:
The floor drain location must be installed according
to the template. This location is critical to the proper installation
of this product.
Note:
You must keep the template, it will be needed during
the next step of the installation process. See
Figure 2
on
page 3.
Note:
Refer to
Figure 2
on page 3 to determine which cut-
outs are designed for use with your particular model.
10
After the finished floor is installed,
position the installation
template on the finished floor. Place the template to line
up with the existing floor drain location and orient the
template to the desired position.
Note:
The sump area location cutout, remote blower tubing
floor location cutout, and water inlet stub-out location
must line up with the template.
Note:
The keypad and Sani-Design
tm
cleaning system
have not been installed. See the forma
TM
Collection
Field
Installation Instructions
for the AirMasseur
®
keypad and
Sani-Design
TM
cleaning system.
11.
Tape the template to the finished floor
using care to align
both center lines and assure that the template is laying
flat on the floor.
12.
Transfer the center lines of the template to the finished floor.
CAUTION:
Use a marker that can be removed from the
finished floor after installation.
13.
Position the Skirt
(only) and align it with the centerlines on
the finished floor. Use the four existing 3/8” holes located
in the bottom four corners of the skirt
to mark where to
drill the pilot holes for the four locating studs. If installing
on a wooden floor, 1/4” [6mm] holes are required, and a
Figure 1
INSTALLATION INSTRUCTIONS
Locating
Studs Kit
Sani Design
Cleaning
System Kit
Tubing with
Clamps
Template
Control Box
(Signature Edition)
Skirt
Bath
Keypad
Bath-Well Protector
Blower with Stand
and Check Valve
Remote Control
(When Supplied)
Packing Board
Stabilizing Nut
and Washer (x4)
5/16" Nut and
Washer (x4)
Press-in
Fastener (x4)