background image

第 2页共 10 页

1.2.3 12P function port corresponding table

1.3 Wiring and Grounding

We must prepare the system grounding project, a qualified electrical engineer is requested for the construction. Product is

energized and ready for use; you must ensure that the power outlet the AC input is securely grounded. The grounding wire is
yellow and green lines, it must be connected to the grid and reliable security protection on the ground to ensure safe use, and
prevent abnormal situation.

2 Operation Panel Instructions

2.1 Operation Panel Display Instruction

According to the system working state, the LCD module of operation panel will display the current sewing mode,

parameters, start / end back tacking, and presser foot, needle position, soft start sewing etc. Function mark of the operation
panel is as follows:

1

2

3

4

5

6

Wire cutting

Electromagnet

power supply

+33V

/

/

Loose line

Electromagnet

power supply

+33V

Lifting foot

Electromagnet

power supply

+33V

Clamp line

Electromagnet

power supply

+33V

7

8

9

10

11

12

Wire cutting

electromagnet

signal

/

/

Loose line

Electromagnet

signal

Lifting foot

Electromagnet

signal

Clamp line

Electromagnet

signal

If it is difficult for inserting plug into socket, please check whether they are matching with each other, or the

inserting direction is correct!

All power lines, signal lines, ground lines, wiring not to be pressed into other objects or excessive distortion, to

ensure safe use!

Summary of Contents for A7

Page 1: ...r properly and safely qualified engineers are required Please stay away from arc welding equipment in order to avoid electromagnetic interference and malfunction of the controller Keep room temperatur...

Page 2: ...f operation panel will display the current sewing mode parameters start end back tacking and presser foot needle position soft start sewing etc Function mark of the operation panel is as follows 1 2 3...

Page 3: ...ng pressed toggle the presser foot function on or off The trajectory of key If click switch the current sewing track 1 4 cycle switch track description Track 1 standard track to reduce fabric sliding...

Page 4: ...voice version V2 represents the recovery code Presser foot key 1 Short press key the icon of LCD is lit the c sewing after the end of automatic trimming presser foot function turns on 2 Long press Key...

Page 5: ...to fully over stalk 3 2 Thin material thickness setting 1 Long press the Thin Thickness Test key to enter the Thin Thickness Test Setting Interface stop the needle to the stop position the needle plat...

Page 6: ...ous stitching according to the time 2 half stitching 3 one stitching P 1 6 0 9999 0 Thickness detection 0 point value P 1 7 0 9999 0 Thick material height P 1 8 0 50 5 A terrier number of threads P 1...

Page 7: ...he Angle relative to Z signal P 5 9 0 359 160 Lower stop needle to adjust the Angle relative to upper stop needle P 6 0 200 5000 4000 Automatically test running speed P 6 1 0 1000 500 Electric Angle v...

Page 8: ...e ratio between motor and machine M 0 2 On the AD value M 2 6 The total used time hours of motor M 0 3 The step zero M 2 7 Software version L M 0 4 busbar voltage M 2 8 Software version H M 0 5 The sp...

Page 9: ...circuit failure Turn off the system power and turn on the power again after 30 seconds to see whether it can work properly Try a few times again If the fault occurs frequently please contact your loc...

Page 10: ...g and restart Please contact your local service provider or call 4008876858 Err 32 Backstitch step motor hardware overcurrent 1 Turn off the system power and then turn on the power again after 30 seco...

Reviews: