Page No: 71
Issue No: 1
Date: 031100
Issued By: PJA
7.5
Engine Installation
Operation
Tools
1)
Fit engine to engine mount
2)
Torque engine mount bolts
up 7/16
Tube
Socket
7/16
Ring
Open
End
Spanner
3)
Fit muffler (if not already fitted) and fit carburettor
3/16 Ball End Allen
Key
heat muff and hose.
4)
Connect left and right ignition coils leads
5)
Connect Tacho sender
6)
Connect exhaust gas temp (if fitted)
7)
Connect cylinder head sender
18mm Spark Plug
socket
8)
Connect
hourmeter
Screw
Driver
9)
Connect oil temp gauge sender
10)
Connect oil pressure gauge sender
11)
Connect
starter 7/16
Ring
Open
End
Spanner
12)
Connect
Battery 10mm
Ring
Open
End
Spanner
13)
Connect fuel line
Screw
Driver
14)
Connect
Oil
Breather
Screw
Driver
15)
Connect Choke Cable
Long Nose Pliers
16)
Connect Throttle Cable
Long Nose Pliers
17)
Connect
Air
Inlet
Screw
Driver
18)
Fit Propeller and spinner
7/16
Ring
Open
End
Spanner
Summary of Contents for 3300
Page 4: ...Page No 4 Issue No 1 Date 031100 Issued By PJA List of Amendments Page Amendment Date Issue...
Page 8: ...Page No 8 Issue No 1 Date 031100 Issued By PJA 1 1 Denomination of Cylinders...
Page 11: ...Page No 11 Issue No 1 Date 031100 Issued By PJA 3 0 PERFORMANCE GRAPHS...
Page 48: ...Page No 48 Issue No 1 Date 031100 Issued By PJA...
Page 52: ...Page No 52 Issue No 1 Date 031100 Issued By PJA...
Page 67: ...Page No 67 Issue No 1 Date 031100 Issued By PJA Drawing 9430064...
Page 89: ...Page No 89 Issue No 2 Date 031100 Issued By PJA...