- 15 -
1. Operation
Do not run pump dry or run it with a discharge valve or a suction valve closed.
■
Starting process
Operate the pump according to the following procedure after installation, tubing and wiring of pump.
No.
Points to be checked
Procedure
1
Tubing, wiring and voltage
● See "
■ Plumbing
" and "
■ Wiring
" sections.
● Check the spec label to see if the power supply voltage is
correct.
2
A discharge and a suction line.
● Fully open both suction and discharge valves.
3
Rotational direction
● Check if the direction of rotation is correct.
Prime the pump and run the motor for just a moment to
check a flow direction.
● Counter clockwise (CCW)
CCW rotation seen from the
motor end. Liquid flows in the
direction of "a".
● Clockwise (CW)
CW rotation seen from the
motor end. Liquid flows in the
direction of "b".
4
Starting
● Run the pump for a while and check liquid flows without a
hitch. Upon finding abnormality, turn off power and solve the
cause of abnormality. Refer to "Troubleshooting" section.
5
Operation
● Make sure air has been expelled from the pump and a tub-
ing system completely. If not, an accurate flow rate can not
be obtained. Angle the pump head to 20º and run the pump
until air is expelled completely. After air is all eliminated,
adjust discharge pressure to a specified level.
● Flow rate can be adjusted from 0 to the maximum by chang-
ing the pump head angle.
6
Points to be checked during
operation
● Do not allow foreign matters to enter the pump. Foreign mat-
ters may cause the plunger to be locked or damaged, hin-
dering a liquid circulation.
Install a dampener to reduce pulsation as necessary. Contact for us for detail.
■
Stoppage
No.
Points to be checked
Procedure
1
Wet ends
● Flush the pump head with clean water after operation with
sticky or settling liquid. Dismantle the pump head for clean-
ing as necessary.
2
Before a long period of stoppage
● Drain liquid from the pump head and dismantle it for clean-
ing before a long period of stoppage.
Operation
a
b
Summary of Contents for Hicera V Series
Page 7: ...5 Outline 1 Unpacking Inspection 6 2 Product outline 6 3 Model code 7 4 Specification 8...
Page 11: ...9 Installation 1 Before installation 10 2 Installation Piping Wiring 12...
Page 16: ...14 Operation 1 Operation 15...
Page 19: ...17 Maintenance 1 Disassembly Assembly 18 2 Troubleshooting 24 3 Dimensions 25 4 Wear parts 27...
Page 30: ...28...
Page 31: ...29...