8
IQ Power Fantom
5201292 Rev A
Figure 5. User Interface Point Cleaner (Schematic)
A momentary application of +5 to +24 volts DC to terminal 5 (terminal 7 being the
return, 0 volts) will activate an automatic point cleaning cycle. If the blower fan is
operating (unit not in standby), the fan will be de-energized and allowed to come
to a stop (approximately 4 seconds). The automatic point cleaner will cycle three
times (approximately 6 seconds). If the unit was not in standby, the blower fan will
resume operation.
Figure 6. User Interface Standby (Schematic)
A continuous application of +5 to +24 volts DC to terminal 6 (terminal 7 being the
return, 0 volts) will place the unit in standby mode. In standby the blower fan and
ionization power supplies are de-energized. It takes approximately five seconds for
the unit to resume operation after the voltage is removed from terminal 6.
Connection to IQ Power Control Station
Two communication ports are available on the Fantom Wide Blower, COMM1 and
COMM2. These communication ports allow connection to an IQ Power Control
Station. Either port may be used for connection. COMM1 provides an M12
connector for round cable and COMM2 provides an RJ-45 connector for modular
cable. Cables of various lengths are available, see Section 8, Parts and Accessories.
NOTE
– DO NOT USE standard Ethernet cables with IQ Power systems.
Avoid permanent equipment damage by using only Simco-Ion modular
cables. (Refer to Section 8, Parts and Accessories).