Operation Manual -
PoWerMaster®
2400 – 30 - 90 kVA
Operator’s Instructions
Document no. 578.650BB
Page 42 of 91
11:27:47
Setup Menu 01/01/2017
GPU Enable
Door Switch
Plug Temperature
Neutral Voltage Supervision
Earth Leakage Level
Earth Leakage Delay
◄ Back
●
Select Parameter.
Setup – Menu structure (continued)
Use the ▼/▲ to browse through the
various set-up lines / parameters. The
selectable line will be highlighed in
green.
Press
●
to select the parameter you
want to change.
Press
●
to Modify parameter.
Parameter will now be highlighted in
green.
Use the ▼/▲ to adjust parameter.
Press
●
to save changes.
Use
◄
to leave the sub-menu and
return to basic Icon Menu.
Note!
Availability of parameters may vary
depending on the mode of the unit
Standby / operating / load profile etc.
Settings:
Bypassed
Active
11:27:47
Setup Menu 01/01/2017
Door Switch
Active
◄ Back
●
Modify
Settings
Bypassed
Active
11:27:47
Setup Menu 01/01/2017
Plug Temperature
Normally Closed
◄ Back
●
Modify
Settings:
0.0 = Disabled
0.1 – 50.0 V
11:27:47
Setup Menu 01/01/2017
Neutral Voltage Supervision
42.0 V
◄ Back
●
Modify
11:27:47
Setup Menu 01/01/2017
GPU Enable
Active
◄ Back
●
Modify
11:27:47
Setup Menu 01/01/2017
Earth Leakage Delay
200 ms
◄ Back
●
Modify
11:27:47
Setup Menu 01/01/2017
Earth Leakage Level
10 A
◄ Back
●
Modify
Settings:
0 – 1000 ms
Settings:
Normally Closed
Normally Open
Settings:
0.0 = Disabled
0.1 – 15,0 A