![Istore 180L Installation Manual Download Page 12](http://html1.mh-extra.com/html/istore/180l/180l_installation-manual_2094340012.webp)
iStore - Installation Manual - June 2020
12
Installation
4.1 Installation Diagram - Left Hand Install
Important information
•
The specification of the water inlet and outlet thread is RBSP3/4 (internal thread)
•
The specification of the PTR valve connecting thread is RBSP3/4 (internal thread)
•
The specification of the anode and the drain port is GBSP3/4 (internal thread)
•
Condensate port connection thread is BSP1/2 (internal thread)
•
Condensate drain shall discharge to an approved discharge point
Filling and commissioning the iStore Hot Water System
1.
Turn on the cold water supply to the tank and open a hot water tap preferably laundry tap without filter as
existing sediment may partially block pre-existing water saving devices.
2.
Leave tap open until all air is bled, then turn off hot water tap.
3. Activate PTR Valve (Pressure relief valve) to ensure system is fully bled of all air.
4.
Once the system is fully pressurised with water, thoroughly check all fittings, connections and pipework for
water leaks.
ATTENTION
: The PTR valve attached with the
unit must be installed, failure to do so will cause
damage to the unit, and possible personal injury.
Do not use stainless steel fittings to connect directly
with other metals to prevent galvanic corrosion.
Hot Water Outlet
COLD WATER INLET
Duo/NRI valve
15mm Brass Tee Piece
PTR 850kPa Pressure
Temperature Relief
Solar Tempering Valve
PRV 500kPa Pressure Reduction Valve
Anode
ECV 700kPa Expansion
Control Valve (If required)
HOT LINE TO HOUSE
RIGHT SIDE TANK
Condensate Drain
Under no circumstances shall the
condensate drain line and PTR/ECV
discharge line be coupled together
into a single common line.