ZR10-D controller
•
Installation and operating instructions
► Secure cabinet box (3) with two ixing screws (6) on
the top-hat rail (5) of the baseplate (2).
► Ensure ixing clips (5) on both sides click accura
tely on the top-hat rail (4).
►
Ensure that the cavity
of the cabinet box (3)
with
the milling grove is on the right hand side.
4
3
5
6
2
►
Feed 3-wire fan cable (8) through the left
cable entry (7).
►
Feed power cable (10) though the right
cable entry (9).
►
Insulate earth conductor (11) with terminal (12).
8
7
0
1
1
1
2
1
9
Ö
The cabinet box is installed
.
Installing the transformer
Requirements:
Power cable in place.
Fan cable in place.
Cabinet box installed.
►
Connect power cable (1) via a lustre terminal (2)
with 2-wire transformer input cable (3).
►
Insert transformer (4) into the cavity with the
milling groove (5).
2
3
1
4
5
assembly anD InsTallaTIon