![inVENTer ZR10-D Installation And Operating Instructions Manual Download Page 38](http://html.mh-extra.com/html/inventer/zr10-d/zr10-d_installation-and-operating-instructions-manual_2083882038.webp)
38
ZR10-D controller
•
Installation and operating instructions
►
Insert
lush mounted box
(8) into wall opening.
►
Secure
lush mounted box (8) with ixing
screws (9) to the left and right.
►
Fill free space between interior wall and
lush
mounted box (8) with appropriate illing material.
192
8
9
►
Remove 70 mm of the cable sheath from each
cable (10).
0
1
noTe
Ensure that the colour sequence of the wires is correct when connecting the cables.
For colour sequence, see section 4: Electrical connections ‒ Connector assignment.
►
Attach wire-ends of the same colour of one pair of
fans to one ferrule (11) each.
1
1
assembly anD InsTallaTIon