ITABAR-Sensor Type
IBFD
Operating
Manual
Fig. 3b: Installation for vertical pipe run
example type IBFD-25…-K1H-A81
Fig. 3b: Installation for vertical pipe run
example type IBFD-25…-K7-A18
Fig. 3b: Installation for vertical pipe run
example type IBFD-25 HTG….K5-A16
4.3.
Horizontal Pipe Arrangement
Always
install the ITABAR steam sensor
horizontally with the instrument connections
(condensation vessels) along a horizontal line.
(Fig. 4a and 4b).
Fig. 4a: Installation for horizontal pipe run,
example type IBFD-25…-K1H-A81
Fig. 4a: Installation for horizontal pipe run,
example type IBFD-25….-K5-A16
Fig. 4a: Installation for horizontal pipe run,
example type IBFD-26-HTG…K5-A16
Fig. 4b: Installation for horizontal pipe run,
example type IBFD-25….-K1H-A81
4