background image

ITABAR-Sensor  Type 

IBFD

 Operating 

Manual 

4. 

General Installation Notes 

In order to obtain optimal measurement results, 
follow the notes concerning the installation of the 
ITABAR sensor given below. 
 

4.1. 

Determination of Pipe Arrangement 

For design reasons, the pipe arrangement at the 
installation location has to be known before the sen-
sor is manufactured. Since the ITABAR sensors for 
vertical lines are not interchangeable with those for 
horizontal lines. 
•  Pipe arrangement, horizontal or vertical 
•  flow direction (only for models with direct  
 

welded condensation vessels) 

•  Wall thickness of pipe 

For horizontal and vertical pipe run the 
condensation vessels have to be arranged in the 
same horizontal plain. 
Compare Fig. 3b and 4b. 
 

Fig. 1:  Horizontal pipe run 
 

Fig. 2:  Vertical pipe run 

 
The flow direction is indicated in each case by the 
arrow on the sensor head. 

4.2. 

Vertical Pipe Arrangement 

  

The ITABAR sensor for flow measurement of steam 
and saturated steam can be installed in vertical pipe 
runs at any location, however, the instrument 
connections have to be located in the same 
horizontal plain (Fig. 3a and 3b). 
 

 

Fig. 3a:  Installation for vertical pipe run, 

example type IBFD-25…K1H-A81 

Differential pressure tap

 

 

Fig. 3a:  Installation for vertical pipe run, 

example type IBFD-25….-K5-A16 

 

 

Fig. 3a:  Installation for vertical pipe run, 

example type IBFD-26 HTG… -K5-A16 

Summary of Contents for ITABAR-Flow-Sensor IBFD

Page 1: ...Installation Notes 3 5 Installation of the ITABAR Sensor 7 6 Insulation 11 8 Measurement Start Up 13 9 Preventive Maintenance 13 10 Trouble shooting sensors with condensate pots 13 INTRA AUTOMATION G...

Page 2: ...you can not neglect friction The dynamic energy will not be transmitted to the differential transmitter without faults You will not get correct measuring results 1 Product Description We congratulate...

Page 3: ...hickness of pipe For horizontal and vertical pipe run the condensation vessels have to be arranged in the same horizontal plain Compare Fig 3b and 4b Fig 1 Horizontal pipe run Fig 2 Vertical pipe run...

Page 4: ...izontal Pipe Arrangement Always install the ITABAR steam sensor horizontally with the instrument connections condensation vessels along a horizontal line Fig 4a and 4b Fig 4a Installation for horizont...

Page 5: ...re subject to wear The sensor is not affected by being slightly out of alignment The influence on the accuracy of the measurements is negligible as long as the limits indicated in Figures 5 6 and 7 ar...

Page 6: ...asuring stretch by conducting a comparison measurement The measurement guarantees that the differential pressure corresponds to the true flow velocity thereby assuring the specified accuracy The follo...

Page 7: ...otential energy This is eliminated for ITABAR Flow Sensors Observe the general installation instructions It is particularly important to make sure that the distance from the gasket surface to the pipe...

Page 8: ...sensor Fig 10 5 Tack the sensor end support with 2 mm clearance onto the pipe 6 Remove the sensor 7 Finish welding of mounting flange and end support can be made 8 Perform the installation of the sen...

Page 9: ...etween this two parts see Fig 12 ATTENTION Please take care on the H dimension in case you did not co ordinate the weld preparation of the pipe system with our work To make sure that sensor matches yo...

Page 10: ...mounting flange again this is important for the exact position of the condensation vessels 5 Now the ITABAR sensor can be installed into the pipe Place the included gasket on the gasket surface of th...

Page 11: ...liquid take place only in the therefore specially designed condensation vessels and not in the head of the sensor Therefore the entire sensor head and all other parts up to the condensation vessels m...

Page 12: ...ITABAR Sensor Type IBFD Operating Manual Sensor with condensate pots K5 6 7 Fig 13a Sensor with condensate pots K1 Fig 13b 12...

Page 13: ...pressure indication Correction Check whether all instrument valves to the p transmitter are opened The valve E must be closed only for zero Check the alignment of the sensor with the pipe The arrow o...

Reviews: