background image

ITABAR-Sensor  Type 

IBFD

 Operating 

Manual 

8. Measurement 

Start-Up 

Make sure that: 
-  all installation openings are closed, 
-  all installed parts are securely bolted together, 
-  all shut-off valve are closed, 
-  all valves of the 3-valve or 5-valve manifold are 
 closed 

Now the pipe can be cleared for the appropriate 
medium. 
Check all connections, especially the flange gasket. 
It takes about 30-60 minutes that the condensation 
vessels will filled with condensate. 
Now you can open the primary line valves A and B. 

 

To vent the measuring system open valves F and G. 
Close the valves when water without air pockets is 
to be seen. 

ATTENTION! 

Take care that for high pressure application the 
vent/drain lines are mounted according to the safety 
instructions. 
Open now the valves for the 

p-transmitter (valve C 

and D). 
Open the valve E for transmitter zero only. 
If transmitter zero is O.K. close the valve E. Allow 
condensate level to stabilise 1/2 hour before 
recording transmitter readings again. 

 

9. Preventive 

Maintenance 

ITABAR sensors are insensitive to dirt and soil 
build-up and therefore nearly maintenance-free. 
However, if cleaning is required: 
-  remove the sensor 
- flush 

completely 

-  hand clean with a soft wire brush 

 

10. 

Trouble shooting sensors with 

condensate pots  

If, after the start-up of the ITABAR sensor, any 
measuring errors occur, they may possibly be 
corrected quite easily: 

 

Error: 

No differential pressure indication 

Correction: 

Check whether all instrument valves to the 

transmitter are opened. 
The valve E must be closed (only for zero). 
Check the alignment of the sensor with the pipe. The 
arrow on the sensor must point exactly in the flow 
direction (downstream). 

 

Error: 

Alternating differential pressure 

Correction: 

Verify that the whole sensor up to the condensation 
vessel is insulated. 
Remove any insulation from condensation vessels! 

 

NOTE: 

Two-Phase flow or alternating phase flow will cause 
an erratic spiking signal. The ITABAR sensors are 
head-measuring devices and will not accurately 
measure two-phase flow. 
ITABAR-Flow-Sensors for low pressure steam have 
condensate pots in which the condensate water line 
is 25mm higher than the flange connection of the 
sensor is installed precise horizontal. 
That means that water column of static and dynamic 
pressure side must have the same high to guarantee 
zero differential pressure when steam is not flowing. 
The arrangment of higher condensate line than 
sensor connection has been done to secure the exact 
water column onto the d.p. transmitter. 
During steam flow the steam will move into the 
condensate pots and will condensate to water. The 
water level above line 1 will flow back into the 
sensor and change again into steam. The steam 
pressure from dynamic and static connection is 
pressing onto the water level and the difference ot 
these pressures will be transmitted into mA- signal 
through the differential pressure transmitter. 
Please note that 25mm deviation in the line of 1 will 
give 25mm WG differential pressure. 

 

 

13 

Summary of Contents for ITABAR-Flow-Sensor IBFD

Page 1: ...Installation Notes 3 5 Installation of the ITABAR Sensor 7 6 Insulation 11 8 Measurement Start Up 13 9 Preventive Maintenance 13 10 Trouble shooting sensors with condensate pots 13 INTRA AUTOMATION G...

Page 2: ...you can not neglect friction The dynamic energy will not be transmitted to the differential transmitter without faults You will not get correct measuring results 1 Product Description We congratulate...

Page 3: ...hickness of pipe For horizontal and vertical pipe run the condensation vessels have to be arranged in the same horizontal plain Compare Fig 3b and 4b Fig 1 Horizontal pipe run Fig 2 Vertical pipe run...

Page 4: ...izontal Pipe Arrangement Always install the ITABAR steam sensor horizontally with the instrument connections condensation vessels along a horizontal line Fig 4a and 4b Fig 4a Installation for horizont...

Page 5: ...re subject to wear The sensor is not affected by being slightly out of alignment The influence on the accuracy of the measurements is negligible as long as the limits indicated in Figures 5 6 and 7 ar...

Page 6: ...asuring stretch by conducting a comparison measurement The measurement guarantees that the differential pressure corresponds to the true flow velocity thereby assuring the specified accuracy The follo...

Page 7: ...otential energy This is eliminated for ITABAR Flow Sensors Observe the general installation instructions It is particularly important to make sure that the distance from the gasket surface to the pipe...

Page 8: ...sensor Fig 10 5 Tack the sensor end support with 2 mm clearance onto the pipe 6 Remove the sensor 7 Finish welding of mounting flange and end support can be made 8 Perform the installation of the sen...

Page 9: ...etween this two parts see Fig 12 ATTENTION Please take care on the H dimension in case you did not co ordinate the weld preparation of the pipe system with our work To make sure that sensor matches yo...

Page 10: ...mounting flange again this is important for the exact position of the condensation vessels 5 Now the ITABAR sensor can be installed into the pipe Place the included gasket on the gasket surface of th...

Page 11: ...liquid take place only in the therefore specially designed condensation vessels and not in the head of the sensor Therefore the entire sensor head and all other parts up to the condensation vessels m...

Page 12: ...ITABAR Sensor Type IBFD Operating Manual Sensor with condensate pots K5 6 7 Fig 13a Sensor with condensate pots K1 Fig 13b 12...

Page 13: ...pressure indication Correction Check whether all instrument valves to the p transmitter are opened The valve E must be closed only for zero Check the alignment of the sensor with the pipe The arrow o...

Reviews: