120
IO
SAVE THESE INSTRUCTIONS
Page 19
(120IO) SEQUOIA SPIRIT™ WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 08/08/2009
English
S
E
T
U
P
I
N
S
T
R
U
C
T
IO
N
S
POOL ENCLOSURE SETUP (continued)
4b. Side panel with “warnings” installation
• Locate the side panel with warnings such that the warnings will be easily seen by
pool users before entering the pool. Unwrap the side boards from pack and slide the
side board first down the support posts and insert onto the vertical edge of the bottom
rail. Follow with the number sequence from bottom to top. The groove of the board
needs to be inserted fully onto the tongue of the previous board. The printing on the side
boards needs to be facing outward (see drawings 12.1 & 12.2).
4c. Other side panel installation
• For 49" height pool, install the rest of the side panels by using eight pieces of side
boards A
(20)
each. For 53" height pool, install the rest of the side panels by using one
piece of side board B
(21)
at the bottom plus eight pieces of side boards A
(20)
each.
Install the side boards one by one from bottom to top. Insert the groove of the first side
board onto the vertical edge of the bottom rail, and the groove of the other side boards
onto the tongue of each previous board. The side boards with wood veins printed need
to be faced outward (see drawings 13.1 & 13.2).
12.1
12.2
13.1
13.2