120
IO
SAVE THESE INSTRUCTIONS
Page 11
(120IO) SEQUOIA SPIRIT™ WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 08/08/2009
English
GROUND PREPARATION
Select an outdoor location for the pool which should be on a level concrete pad. If there is no
concrete pad available, follow the instructions below to prepare the installation area. It is
important you ask a professional (builder or gardener) to perform the following ground
preparation.
Note:
Tools are not included.
1. Mark the installation area
• Once the location area is chosen, drive stake at center point of where you wish pool to
be located. Attach string to center stake. Measure the length A on string, and attach
marking stick, paint marker, or funnel with flour to string. Mark circumference of pool
area using string and marker (see drawing 1.1).
• For 16'8" (508 cm) pool, where
A = 8'9” (266.7 cm) = Radius of grass area need to be removed and leveled.
For 18’8" (569 cm) pool, A = 9'9" (297.1 cm)
see drawing 1.2.
S
E
T
U
P
I
N
S
T
R
U
C
T
IO
N
S
POOL SETUP (continued)
A
1.1
1.2