120
IO
SAVE THESE INSTRUCTIONS
Page 12
(120IO) SEQUOIA SPIRIT™ WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 08/08/2009
English
2. Clear the installation area
• Remove all grass, stones and sticks from marked area. Also remove center stake and
string.
3. Leveling
• Establish lowest point in pool area. Level entire pool site by digging or scraping away
uneven areas to the level of the lowest point.
Always remove material from the top of
the slope rather than filling in the bottom
to ensure greater ground stability and
firmness. When all the areas are level and when excess ground is removed, you may fill
any
small low areas
which are left to level (with fined dirt or sieved sand). Always
compact and level ground afterwards (see drawing 2.1).
• Use a large mason rule (aluminum or wood) and a level. Level out the ground by cutting
rectangles (or squares), locating this rule in the selected and cleaned area (see
drawing 2.2).
4. Finishing
• On the cleaned and leveled ground, spread a light coat of sieved sand to a maximum
depth of 1/2 inch (1 cm). Spray water and compact it (with a garden roller). Double
check and ensure it is well leveled. The ground has to be perfectly level in order to
proceed further.
S
E
T
U
P
I
N
S
T
R
U
C
T
IO
N
S
POOL SETUP (continued)
Always remove material from the top of the
slope rather than filling in the bottom.
Do not add
Remove
Remove
Unacceptable
Grade
Acceptable
Grade
2.1
2.2