Interroll Module belt conveyor SH 1100
Maintenance and repair
70
Version 1.0 (06/2022) en
Translation of original operating instructions
Requirement:
R
The module is shut down.
4
Remove the module conveyor,
see "Replacing the module conveyor", page 57
4
Loosen fastening profiles (7) together with the inside and outside sliding guides (2, 4) to the
top from the securing blocks.
4
Loosen screws (6) out of the plastic fasteners (5) at the inside sliding guides (4) and pull
fasteners (5) off the sliding guides (4).
4
Push sliding guides (2, 4) off the fastening profiles (7).
4
Properly dispose of the old sliding guides.
4
Push sliding guides (2, 4) onto the fastening profiles (7).
4
Push plastic fasteners (5) onto the ends of the inside sliding guide (4) and secure them with
screws (6).
4
Click fastening profiles (7) together with the sliding guides (2, 4) onto the securing blocks of
the guide rail (1).
4
Install the module conveyor in reverse order.