Interroll Module belt conveyor SH 1100
Installation
20
Version 1.0 (06/2022) en
Translation of original operating instructions
The module is provided with voltage either via CEE plug or direct installation in the control
cabinet.
4
Check cables and components for damage before installation.
4
The connection values of the module are listed on the motor nameplate.
Static electricity
Take proper measures for grounding and potential equalization.
Use only original fuses with specified amperage.
Torque
When tightening screws and nuts, always observe the standard tightening torque, unless
specifically indicated otherwise. Standard screw lockers should be replaced as needed.
Grounding
During installation of the module, its grounding must be ensured. A grounding connection, which
is fastened at the supports, is intended for this purpose. It is recommended to connect a
grounding connection with grounding cable every 20 m.
Orientation
4
Align the module using the height-adjustable feet of the support. The roller top edge (for
roller conveyors) or the module conveyor top edge (for module belt conveyors) is the
relevant height for aligning the modules. Use suitable tools for the alignment (spirit level or
rotation laser).
4
Secure the adjusted height.
4
During alignment of the module, ensure that no moving parts are touching.
Connection
4
Connect the individual modules with each other using the profile connector.
4
During the setup of the module, check the passageways for the personnel. Install transitions
as necessary.
Anchoring
4
Anchor or fasten the module torsion-free, e.g. to the floor or to adjacent components.
Integration into complete
system
4
When integrating the module into the complete system, consider possible danger spots,
particularly infeed locations and interfaces.