Section 1, Overview
1.6 Testing and Inspection
After all components have been properly installed according to standard
practices, RVIA or ABYC standards, and the recommendations of this
Installation and Operating Manual, The WaterHeater™ by ITR should be
test-operated for inspection purposes.
For your convenience, you can use the pullout Inspection Check Sheet in
this Manual. The Inspection Check Sheet is divided into progressive
sections, allowing each phase of the inspection to be carried out
systematically, and then signed off by authorized persons.
1-6
The WaterHeater™ by ITR