
Chapter 4: Web configuration
214
NS3562-8P-2S User Manual
Scheduled power recycling
The managed switch allows each of the connected PoE IP cameras to reboot at a
specific time each week, thus reducing the chance of IP camera crashes resulting from
buffer overflow.
Define the PoE schedule and schedule power recycling on the PoE Schedule page.