Fig. 1

Minimum Concrete Pads – CITY 2™ Slide

(Plan View – NOT to Scale)

Pool Edge

5 concrete pads are needed:
(1) 12” wide x 32” long x 12” deep
(4) 16” wide x 16” long x 12” deep

Center feet on pads

When  installing  an  Inter-Fab  City  2™  slide  using  a  paver  kit,  you  must  ensure  that  all  standard
installation requirements are met.  The slide must be compatible with the type of pool on the intended
installation and all ANSI/APSP/ICC-5 2011  requirements must be met.  Refer to installation manual.

Figure 1 illustrates an example of the minimum concrete pads recommended for the City 2™ slide.
Specific slide position and concrete pad orientations may vary.  Make sure to allow for water stub
up location near the ladder section of the City 2™ slide when pouring the concrete pad for the ladder
section.  In order to ensure proper placement, you will need to set the slide up first to determine
where the concrete pillars will be located.

Figure 2 shows a side view illustration of the City 2™ slide foot deck anchor and wedge anchors
used in a paver installation.  NOTE: 4 ea. CITY-DECK ANCHOR are also required (not included
with slide or paver kit) to complete the City 2™ paver installation. 
Pavers can be a maximum
of 3” thick.  Pavers must be mechanically attached to the concrete pad using a setting material
(such as mortar or thinset for example) that is no thicker than 3/8”.  

1” of each 3/8” x 7” wedge anchor (18 ea.) needs to be exposed above the final deck surface.
The 3/8” wedge anchors must be drilled to a depth of 6” with 1” of the bolt left remaining above
the final deck surface.  The 3/8” x 7” wedge anchors (16 ea.) replace the 5/16” lag bolts and
lag shields (16 ea.) included with the required CITY-DECK ANCHOR parts (4 ea.), one set per leg.
See Figure 3. The remaining 3/8” x 7” wedge anchors (2 ea.) are used (1 per side) to attach the
ladder bottom to the concrete pad and replace the 1/4” x 2-1/4” wedge anchors (4 ea.) from
hardware kit CS-101-SS.  

The ladder bottom must have the forward 1/4” hole on each side (toward slide) drilled to 1/2” to
accommodate the 3/8” x 7” wedge anchor.  The rear 1/4” holes on the ladder bottom are not
used with the paver installation.  See Figure 4.  You will need to factor in the thickness of your paver
(3” MAX.) and the thickness of your setting material (3/8” MAX.) for your individual installation.

You will need a 3/8” masonry bit and a 1/2” regular bit for the City 2™ slide. 

Inter-Fab Inc. will not be responsible for damage to pavers caused by drilling or mechanically
attaching  to  concrete  pad.    Refer  to  paver  manufacturer’s  specific  installation  instructions
before beginning.

Fig. 2

Example of Deck Anchor on Concrete Pad 

(Side View)

CONCRETE

12” min.

Layer of setting 
material to
secure pavers 
to concrete.

PAVERS

3” 
max.

Drawing Is
NOT To Scale

HEIGHT OF WEDGE
ANCHOR ABOVE
FINAL DECK 
SURFACE 

WEDGE 
ANCHORS

16” min.

5” min.

from edge

DECK ANCHOR

PAVER KIT INFO – CITY 2 SLIDE

Summary of Contents for The city 2 slide

Page 1: ...l codes and other building and safety laws and regulations Among other things that your installer should carefully analyze the need to bond the product to prevent an electrical hazard Failure to properly install this product could result in a dangerous condition including but not limited to electrical or structural hazards Inter Fab Inc disclaims all liability arising from the installation and the...

Page 2: ...ope 3 Slide Footprint Diagrams 4 Slide Position Diagrams 5 Step 1 6 Step 2 7 Step 3 7 Step 4 A 8 Step 4 B 8 Step 5 9 Inspection Check List 10 Slide Care Maintenance 10 Paver Kit Information 11 12 Exploded View of City 2 Slide 13 Parts List corresponds with exploded view 14 Hardware Parts List 15 Pages for Notes 16 17 Inter Fab Limited Warranty 18 ...

Page 3: ...ter delivery system is on and lubricating the slide prior to use 15 Collision with another swimmer or a diver can result in serious injury or death for one or both persons Before sliding always make sure that the path in front of the slide is free from any including submerged obstructions including other people or objects in the pool such as rafts inner tubes etc When a diving board is also presen...

Page 4: ... A which is located four feet six inches 4 6 from the back wall of the pool A minimum depth of four feet 4 must be maintained at a distance of nine feet 9 along the centerline of the slide from point A The above described water depth profile shall extend a minimum of three feet three inches 3 3 on either side of the centerline of the slide See Diagrams A B C 1 3 6 6 6 13 6 20 Max C E N T E R WATER...

Page 5: ...DIAGRAMS DIAGRAM D RIGHT TURN SLIDE DIAGRAM E LEFT TURN SLIDE NOTE FINAL POSITION MUST ENSURE THAT ALL WATER FALLING OFF SLIDE LANDS IN POOL DIMENSIONS MAY VARY FROM SLIDE TO SLIDE IT IS RECOMMENDED THAT THE FULLY ASSEMBLED SLIDE BE USED AS A TEMPLATE FOR INSTALLATION RECOMMENDED MIN DECK AREA 12 x 5 ...

Page 6: ... A N U A L C I T Y 2 S L I D E 5 Rev 7 15 SBK CITY2 INSTL SLIDE WATER STUB UP PLACEMENT DIAGRAMS DIAGRAM F City 2 Slide Left Turn NOT TO SCALE DIAGRAM G City 2 Slide Right Turn NOT TO SCALE 3 MINIMUM OVERHANG 3 MINIMUM OVERHANG ...

Page 7: ...s Turn flume sections upside down check flume gasket integrity Diagram H Align bolt holes on the flanges Use vice grips to hold halves together Diagram I Use a small dab of anti seize lubricant included on the bolt threads Insert bolts hardware kit CS 102 SS flume to flume Diagram J NOTE Hardware Order bolts washers slide flange slide flange washers nuts Check flume at inside seam for even fit HAN...

Page 8: ... end of both handrails STEP THREE Slide Assembly Procedure 1 Slip the two short legs over the 2 aluminum projections on the underside of the Lower Flume NOTE The shorter of the two legs will go on the projection on the inside of the flume curve 2 Using two people and while holding the two legs in place turn the slide over 3 One person must now hold the slide at its normal height while the second p...

Page 9: ...OUR B INSTALLING SLIDE USING DECK FLANGES SOLD SEPARATELY Position the slide relative to the pool wall per the slide placement instructions shown in Diagrams D and E ensuring that the minimum water safety envelope is maintained as shown in Diagrams A B C Once the slide is properly positioned place a deck anchor over each slide leg and using the 4 holes on each flange as a template drill four 1 2 d...

Page 10: ...am P Use PVC primer and glue to attach the feed hose to the slide fitting Diagram Q Attach ball valve shut off near deck stub up Diagram R Attach hose to deck stub up last NOTE Make sure that the water stub up is at least 2 in front of the ladder toward pool Water Supply Includes 10 of 1 2 flex PVC pipe 1 2 on off ball valve For best results use clear glue and primer for plumbing installation DIAG...

Page 11: ...THE WATER IN FRONT OF THE SLIDE EXIT AND CONFIRM COMPLIANCE WITH DIAGRAMS A B C 7 CERTIFY THE PROPER POSITION OF THE SLIDE EXIT AS SHOWN IN DIAGRAMS D E 8 VERIFY THE SLIDE WARNING LABEL IS SECURELY ADHERED TO THE SLIDE 9 GIVE THESE INSTALLATION INSTRUCTIONS TO THE CUSTOMER AND GO OVER THE INTENDED USE INSTRUCTIONS WITH THEM CITY 2 SLIDE CARE MAINTENANCE Your slide requires periodic maintenance to ...

Page 12: ...l such as mortar or thinset for example that is no thicker than 3 8 1 of each 3 8 x 7 wedge anchor 18 ea needs to be exposed above the final deck surface The 3 8 wedge anchors must be drilled to a depth of 6 with 1 of the bolt left remaining above the final deck surface The 3 8 x 7 wedge anchors 16 ea replace the 5 16 lag bolts and lag shields 16 ea included with the required CITY DECK ANCHOR part...

Page 13: ...at are included with the CITY DECK ANCHOR See Figure 5 Fig 4 Fig 5 You will need a 3 8 masonry bit and a 1 2 regular bit for the City 2 slide Inter Fab Inc will not be responsible for damage to pavers caused by drilling or mechanically attaching to concrete pad Refer to paver manufacturer s specific installation instructions before beginning PAVER KIT INFO CITY 2 SLIDE CONTINUED ...

Page 14: ...I N S T A L L A T I O N M A N U A L C I T Y 2 S L I D E 13 Rev 7 15 SBK CITY2 INSTL CITY 2 SLIDE CITY2 CLW ...

Page 15: ...em ordered separately 1 9 5 16 Concrete Insert Lag Shield 4 10 5 16 x 2 1 2 Hex Lag Screw S S 4 11 1 4 x 3 Hex Bolt S S 1 12 1 4 Flat Washer S S 8 4 13 1 4 x 3 8 Aluminum Bushing 1 14 1 4 Lock Washer S S 8 15 1 4 Finish Nut S S 8 1 16 1 4 x 2 1 4 Wedge Anchor S S w Washer 4 17 1 4 x 2 1 4 Tap Bolt S S 2 18 1 4 x 12 Carriage Bolt 2 19 7 1 2 Aluminum Spacer 2 20 Round to Flat Nylon Connector 4 21 Ro...

Page 16: ... s 12 H SS 3 8 FLT WASHER 3 8 x 1 flat washer s s 6 H SS 3 8 LOC WASHER 3 8 lock washer s s 6 H SS 3 8 F NUT 3 8 finish nut s s 12 H 562 X 390 CAP gray protective cap 1 H ANTI SEIZE one packet of anti seize bolt lubricant CITY 2 HANDRAILS QTY PART NUMBER COMPONENT DESCRIPTION 2 CITY HANDRAIL aluminum slide handrails CITY 2 SLIDE LEGS QTY PART NUMBER COMPONENT DESCRIPTION 2 H 45 500 LEG 45 50 alumi...

Page 17: ...I N S T A L L A T I O N M A N U A L C I T Y 2 S L I D E 16 Rev 7 15 SBK CITY2 INSTL NOTES ...

Page 18: ...I N S T A L L A T I O N M A N U A L C I T Y 2 S L I D E 17 Rev 7 15 SBK CITY2 INSTL NOTES ...

Page 19: ...actuator have a warranty period of one 1 year from the date of original shipment Unless expressly stated otherwise all products manufactured by Inter Fab are for residential installation single family residence inground pool use only Inter Fab Inc expressly disclaims any and all warranties and liability arising from the installation or use of its residential products for any non residential use su...

Reviews: