background image

I N S T A L L A T I O N   M A N U A L

C I T Y   2   S L I D E ™

8

Rev. 7/15  (SBK-CITY2 INSTL)

DIAGRAM M

DIAGRAM N

DIAGRAM O

ELECTRICAL BONDING: Electrical bonding is required and slide must be installed in accordance with your local code.  Bond
each tubular leg by placing a bonding wire between the leg and the bonding washer and secure with a self tapping screw.
See Diagram M above.  Bond the handrails by placing the bonding wire under the lowest washer & nut on each side of the
ladder and run the bonding wires down the inside of each ladder leg.

STEP FOUR (A):

INSTALLING SLIDE PRIOR TO POURING DECK

Position  the  slide  relative  to  the  pool  wall  per  the  slide
placement instructions shown in Diagrams D and E, ensuring
that the minimum water safety envelope is maintained as
shown in Diagrams A, B & C. Position slide so that the legs
and ladder bottoms will be 4" (10 cm) below the finished
grade.

Utilizing a 1/2" diameter drill enlarge the holes at the bottom
of each slide leg and insert a 6” length of 3/8" diameter
rebar through each hole. 

Once the correct slide location has been determined install
a 1/2" (stub-up) from the pool return. The stub-up should
be located near the inside right side ladder leg, at least 2”
in  front  of  ladder  towards  pool.  Installing  a  3  way  valve
between the stub-up and the slide plumbing is suggested.

Level top surface of the slide exit runway. Level the top of
the  slide  in  both  directions.  Level  the  ladder  using  a  level
on any step. Ensure that the ladder is sloped 15 degrees
from  vertical  (see  Diagram  C)  then,  should  no  vertical
adjustment of the slide legs be required, drill a small pilot
hole,  then  screw  one  14  X  1  self  tapping  screw  through
each leg (approx. 1" below the top of the leg) into the leg
spud;  otherwise,  move  the  legs  in  relation  to  the  spuds
until  proper  leveling  is  obtained  before  inserting  the
screws.

Secure the slide so it will not move while the deck is being
poured. TIP: to allow for easy removal of concrete from the
ladder  and  legs  apply  a  heavy  coat  of  wax  or  wax  paper
approximately 1 foot above the deck surface. Allow concrete
to cure for 24 hours prior to using the slide.

STEP FOUR (B):

INSTALLING  SLIDE USING  DECK  FLANGES  (SOLD
SEPARATELY)

Position  the  slide  relative  to  the  pool  wall  per  the  slide
placement instructions shown in Diagrams D and E, ensuring
that the minimum water safety envelope is maintained as
shown in Diagrams A, B & C. 

Once the slide is properly positioned, place a deck anchor
over each slide leg and using the 4 holes on each flange as
a template drill four 1/2" diameter holes into the deck to
a depth of 2 1/2". Insert the anchor into the hole until it
is flush with the surface. Position the flange, insert the lag
bolt and tighten. (see Diagram N & O above)

Ensure that the ladder is sloped 15 degrees from vertical
(see  Diagram  C)  then,  using  the  2  holes  on  each  ladder
foot as a template drill 1/4" holes 2" (5 cm) deep. Drive 2
anchor stud bolts into the ladder leg positions so that 1/2"
(1.3 cm) of the studs project above the deck and unscrew
the nuts from the anchors. Place the slide so the legs drop
into the deck anchors and the ladder legs locate over the
stud anchors, secure the ladder leg nuts onto the anchors.

Once the slide legs are within the deck flanges (ignoring the
existing  holes  in  the  slide  legs)  drill  a  1/4"  hole  into  the
slide leg through the center of the large 3/8" hole in the
deck  flange.  Insert  the  aluminum  bushing  into  the  hole  in
the flange until it hits the slide leg, now insert the bolt thru
the  bushing  about  1"  into  the  slide  leg.  With  the  bolt  in
position, drill a 1/4" hole into the slide leg thru the hole in
the  opposite  side  of  the  flange.  Push  the  bolt  completely
thru the slide leg, add washer and tighten nut.

Level top surface of the slide exit runway. Level the top of
the  slide  in  both  directions.  Level  the  ladder  using  a  level
on any step. Should no vertical adjustment of the slide legs
be required, drill a small pilot hole,  then screw one 14 x
1  self  tapping  screw  through  each  leg  (approx.  1"  below
the top of the leg) into the leg spud; otherwise, move the
legs in relation to the spuds until proper leveling is obtained
before inserting the screws.

NOTE:

YOU WILL CHOOSE TO EITHER FOLLOW STEP

FOUR A OR B DEPENDING ON WHETHER THE SLIDE
WILL  BE  AN  IN-DECK  OR  ON-DECK  INSTALLATION.
INTER-FAB  CANNOT/DOES  NOT  GUARANTEE  THE
CUSTOMER’S CONCRETE DECK.

Small Hole (5/16”)

Lock Nut

Washer

Slide Leg

Slide Flange

Large Hole (3/8”)

1/4” Through Bolt

Washer

Aluminum Bushing

Summary of Contents for The city 2 slide

Page 1: ...l codes and other building and safety laws and regulations Among other things that your installer should carefully analyze the need to bond the product to prevent an electrical hazard Failure to properly install this product could result in a dangerous condition including but not limited to electrical or structural hazards Inter Fab Inc disclaims all liability arising from the installation and the...

Page 2: ...ope 3 Slide Footprint Diagrams 4 Slide Position Diagrams 5 Step 1 6 Step 2 7 Step 3 7 Step 4 A 8 Step 4 B 8 Step 5 9 Inspection Check List 10 Slide Care Maintenance 10 Paver Kit Information 11 12 Exploded View of City 2 Slide 13 Parts List corresponds with exploded view 14 Hardware Parts List 15 Pages for Notes 16 17 Inter Fab Limited Warranty 18 ...

Page 3: ...ter delivery system is on and lubricating the slide prior to use 15 Collision with another swimmer or a diver can result in serious injury or death for one or both persons Before sliding always make sure that the path in front of the slide is free from any including submerged obstructions including other people or objects in the pool such as rafts inner tubes etc When a diving board is also presen...

Page 4: ... A which is located four feet six inches 4 6 from the back wall of the pool A minimum depth of four feet 4 must be maintained at a distance of nine feet 9 along the centerline of the slide from point A The above described water depth profile shall extend a minimum of three feet three inches 3 3 on either side of the centerline of the slide See Diagrams A B C 1 3 6 6 6 13 6 20 Max C E N T E R WATER...

Page 5: ...DIAGRAMS DIAGRAM D RIGHT TURN SLIDE DIAGRAM E LEFT TURN SLIDE NOTE FINAL POSITION MUST ENSURE THAT ALL WATER FALLING OFF SLIDE LANDS IN POOL DIMENSIONS MAY VARY FROM SLIDE TO SLIDE IT IS RECOMMENDED THAT THE FULLY ASSEMBLED SLIDE BE USED AS A TEMPLATE FOR INSTALLATION RECOMMENDED MIN DECK AREA 12 x 5 ...

Page 6: ... A N U A L C I T Y 2 S L I D E 5 Rev 7 15 SBK CITY2 INSTL SLIDE WATER STUB UP PLACEMENT DIAGRAMS DIAGRAM F City 2 Slide Left Turn NOT TO SCALE DIAGRAM G City 2 Slide Right Turn NOT TO SCALE 3 MINIMUM OVERHANG 3 MINIMUM OVERHANG ...

Page 7: ...s Turn flume sections upside down check flume gasket integrity Diagram H Align bolt holes on the flanges Use vice grips to hold halves together Diagram I Use a small dab of anti seize lubricant included on the bolt threads Insert bolts hardware kit CS 102 SS flume to flume Diagram J NOTE Hardware Order bolts washers slide flange slide flange washers nuts Check flume at inside seam for even fit HAN...

Page 8: ... end of both handrails STEP THREE Slide Assembly Procedure 1 Slip the two short legs over the 2 aluminum projections on the underside of the Lower Flume NOTE The shorter of the two legs will go on the projection on the inside of the flume curve 2 Using two people and while holding the two legs in place turn the slide over 3 One person must now hold the slide at its normal height while the second p...

Page 9: ...OUR B INSTALLING SLIDE USING DECK FLANGES SOLD SEPARATELY Position the slide relative to the pool wall per the slide placement instructions shown in Diagrams D and E ensuring that the minimum water safety envelope is maintained as shown in Diagrams A B C Once the slide is properly positioned place a deck anchor over each slide leg and using the 4 holes on each flange as a template drill four 1 2 d...

Page 10: ...am P Use PVC primer and glue to attach the feed hose to the slide fitting Diagram Q Attach ball valve shut off near deck stub up Diagram R Attach hose to deck stub up last NOTE Make sure that the water stub up is at least 2 in front of the ladder toward pool Water Supply Includes 10 of 1 2 flex PVC pipe 1 2 on off ball valve For best results use clear glue and primer for plumbing installation DIAG...

Page 11: ...THE WATER IN FRONT OF THE SLIDE EXIT AND CONFIRM COMPLIANCE WITH DIAGRAMS A B C 7 CERTIFY THE PROPER POSITION OF THE SLIDE EXIT AS SHOWN IN DIAGRAMS D E 8 VERIFY THE SLIDE WARNING LABEL IS SECURELY ADHERED TO THE SLIDE 9 GIVE THESE INSTALLATION INSTRUCTIONS TO THE CUSTOMER AND GO OVER THE INTENDED USE INSTRUCTIONS WITH THEM CITY 2 SLIDE CARE MAINTENANCE Your slide requires periodic maintenance to ...

Page 12: ...l such as mortar or thinset for example that is no thicker than 3 8 1 of each 3 8 x 7 wedge anchor 18 ea needs to be exposed above the final deck surface The 3 8 wedge anchors must be drilled to a depth of 6 with 1 of the bolt left remaining above the final deck surface The 3 8 x 7 wedge anchors 16 ea replace the 5 16 lag bolts and lag shields 16 ea included with the required CITY DECK ANCHOR part...

Page 13: ...at are included with the CITY DECK ANCHOR See Figure 5 Fig 4 Fig 5 You will need a 3 8 masonry bit and a 1 2 regular bit for the City 2 slide Inter Fab Inc will not be responsible for damage to pavers caused by drilling or mechanically attaching to concrete pad Refer to paver manufacturer s specific installation instructions before beginning PAVER KIT INFO CITY 2 SLIDE CONTINUED ...

Page 14: ...I N S T A L L A T I O N M A N U A L C I T Y 2 S L I D E 13 Rev 7 15 SBK CITY2 INSTL CITY 2 SLIDE CITY2 CLW ...

Page 15: ...em ordered separately 1 9 5 16 Concrete Insert Lag Shield 4 10 5 16 x 2 1 2 Hex Lag Screw S S 4 11 1 4 x 3 Hex Bolt S S 1 12 1 4 Flat Washer S S 8 4 13 1 4 x 3 8 Aluminum Bushing 1 14 1 4 Lock Washer S S 8 15 1 4 Finish Nut S S 8 1 16 1 4 x 2 1 4 Wedge Anchor S S w Washer 4 17 1 4 x 2 1 4 Tap Bolt S S 2 18 1 4 x 12 Carriage Bolt 2 19 7 1 2 Aluminum Spacer 2 20 Round to Flat Nylon Connector 4 21 Ro...

Page 16: ... s 12 H SS 3 8 FLT WASHER 3 8 x 1 flat washer s s 6 H SS 3 8 LOC WASHER 3 8 lock washer s s 6 H SS 3 8 F NUT 3 8 finish nut s s 12 H 562 X 390 CAP gray protective cap 1 H ANTI SEIZE one packet of anti seize bolt lubricant CITY 2 HANDRAILS QTY PART NUMBER COMPONENT DESCRIPTION 2 CITY HANDRAIL aluminum slide handrails CITY 2 SLIDE LEGS QTY PART NUMBER COMPONENT DESCRIPTION 2 H 45 500 LEG 45 50 alumi...

Page 17: ...I N S T A L L A T I O N M A N U A L C I T Y 2 S L I D E 16 Rev 7 15 SBK CITY2 INSTL NOTES ...

Page 18: ...I N S T A L L A T I O N M A N U A L C I T Y 2 S L I D E 17 Rev 7 15 SBK CITY2 INSTL NOTES ...

Page 19: ...actuator have a warranty period of one 1 year from the date of original shipment Unless expressly stated otherwise all products manufactured by Inter Fab are for residential installation single family residence inground pool use only Inter Fab Inc expressly disclaims any and all warranties and liability arising from the installation or use of its residential products for any non residential use su...

Reviews: