15
Installation instructions & user guide
T210042 v1.00 March 2022 - InstaTap Commercial
6.5 I2CBC1020 General in cupboard arrangement
SECTION 6 Installing the under counter appliances
6.6 I2CB20 - I2CB50 General arrangement
Under counter top installation
• Install the under counter
boiler as close to the tap as
possible, use the illustration
below as a guide, and follow
the steps through this
section of the manual.
Mains water supply
1
2
Water block
3
4
UCB Mains electricity supply
5
Font waste pipe
6
Waste to drain
7
UCB Control cable
8
UCB mains water connection
9
Water filter & head
10
UCB Boiling water tube
11
UCB vent tube
12
UCB overflow
13
Under counter boiler (UCB)
Isolation valve (install rail inc.
non return valve)
12
11
2
5
10
13
3
7
6
4
1
9
8