40
| [email protected] | 1-800-828-7280
Cooking
Starting with...
Do this!
Pasteurized or
unpasteurized milk
Follow all the steps below
Ultra-pasteurized milk
Skip to
Step 2: Add starter culture
.
This is the “cold start” method of yogurt making.
What You’ll Need:
• Food Thermometer
• Milk or a non-dairy alternative
• Active yogurt culture
Step 1: Pasteurize milk
01
Add milk or milk alternative to the inner
pot, and any other ingredients that your
recipe calls for.
02
Place and close the pressure cooking
lid as described in
Pressure control
features: Pressure cooking lid
.
03
Touch
Yogurt
.
04
Touch the
Temperature field
to toggle
to
High
.
The pasteurization time and
temperature are preset and cannot be
adjusted.
05
Press
Start
to begin.
The display shows
On
and the
progress bar shows
Pre-heating
.
Boil
will display as the progress bar
switches to cooking.
06
The display shows
End
when
pasteurization is complete.
Milk must reach a minimum of 72°C
/ 161°F to pasteurize properly. Use a
thermometer to check the temperature.
Step 2: Add starter culture
01
Using a thermometer, allow the milk to
cool to just below 43°C / 110°F.
02
Add your starter culture to the milk
according to the instructions included
with the starter culture product.
Plain yogurt with active cultures can
be used as a starter. Follow a trusted
Instant Pot yogurt recipe when using
yogurt as a starter culture.
03
Place and close the pressure cooking
lid as described in
Pressure control
features: Pressure cooking lid
.
Step 3: Ferment milk
01
Touch
Yogurt
.
02
Touch the
Temperature field
to toggle
to
Low
.
To set a custom temperature, touch
the
Temperature field
to toggle to
Cus
, then turn the dial to select a
temperature.
03
Touch the
hours field
or the
minutes
field
, then turn the dial to adjust the
fermentation time in hours and/or
minutes.
04
Touch
Start
to begin. The display shows
On
and the progress bar shows
Pre-heating
.
05
The display shows
End
when
fermentation is complete.
112-0124-01-0101_IB_Pro-Plus_Interim_GSG_FINAL.indd 40
112-0124-01-0101_IB_Pro-Plus_Interim_GSG_FINAL.indd 40
7/9/21 1:58 PM
7/9/21 1:58 PM