When setup completes, close back to "Summary" , click "Run Auto-tracker" , and the so ware starts automatically
calculating tracking points. The computing time is related to computer configuration and video duration.
A er calculation, each frame will appear many green tracking points. Next, we need to hold down "shi " key, select
the track point near ground line, drag timeline, ensure that it is along with time schedule, and tracking points should
be all checked.
A er check-out, press "P" on the keyboard, pull out stable settings window, select "peg" in "Transition" , select "peg"
in "Rotation" . Click "OK" , close the window, wait for the so ware to complete automatic computing.
Summary of Contents for Titan
Page 1: ...Titan Titan User Manual English ...
Page 10: ...1 1 2 Introduction to official accessories ...
Page 26: ......
Page 31: ...http shop nodalninja com carbon fiber poles ...
Page 33: ......
Page 36: ......
Page 45: ......
Page 58: ...Property ...
Page 72: ...Methods for creating HDR images by using Photoshop ...
Page 73: ......
Page 81: ......
Page 82: ...Open camera raw filter for color grading ...
Page 83: ...Once again we apply polar coordinate effect to return to the rectangular of 2 1 ...
Page 88: ......
Page 134: ...Clip material on timeline ...
Page 138: ......
Page 146: ......
Page 152: ......
Page 162: ...Wipe off drones using seal tools The method is the same with PS ...
Page 175: ...Modify minimum Trakers Frame to be around 50 Maximum tracker Count to be around 500 ...
Page 189: ......
Page 201: ... 2 Click Start ...
Page 202: ... 3 A er stitching calibration select the option you need If there s no problem click Done ...
Page 203: ......
Page 212: ...4 2 3 Beginner Live streaming while storing Check according to your own needs ...
Page 227: ......
Page 230: ...Please check the operating video https v qq com x page l0522wvhdov html start 29 ...