
Align the new particulate control
ring notches with the containment
shell’s molded keys and press in
place.
Attach one end of the gasket on
the containment shell.
Slide your index fingers around the
gasket, forcing it down while hold-
ing it in place with your thumbs.
Locate the
molded keys
on the
containment shell.
Locate the
notches
on the par-
ticulate control ring.
Pull the old particulate control ring
out.
Check the gasket O-ring for dirt or
deformation before placing on the
impeller. Replace if the O-ring nec-
cessary.
With the small chanel lock pliers,
grip the old particulate control ring
near one of the notches.
Tools Needed
Small channel lock pliers
þ
Page 21
Section K - Containment Shell Repair
Removal
Installation
Unless there is visual damage to
the particulate control ring, re-
moval is not necessary and is not
part of the normal inspection pro-
cedure.
Note