Safety Precautions
Safety Precautions
Read these instructions carefully before you install, operate, or transport EonNAS.
Installation and Operation
Install the rack cabinet and the associated equipment at a site where the ambient
temperature stays lower than 35
°
C.
Install the power source socket outlet near the enclosure where it is easily accessible
and ground the rack cabinet.
Secure airflow clearance inside and around the rack cabinet.
- Secure an 18 to 20cm clearance on the rear side.
- Do not cover the enclosure openings.
- Route the cables inside the rack cabinet.
- Do not leave the drive bays empty, since it will affect the airflow efficiency.
Secure each enclosure module using its retaining screws.
Put the power cords and other cables away from foot traffic. Do not place stuff over the
power cords and make sure they do not rest against data cables.
Install all modules to the enclosure before powering on the EonNAS.
Ensure that the correct power range is being used before powering the device.
None of the covers or replaceable modules should be removed during operation.
If the enclosure is not used for a long time, disconnect it from mains to avoid transient
over-voltage.
Ensure both power supplies are plugged-in and operational at all times. Should one
fail, organize a replacement immediately.
Important Notice
The use of certified components is strongly recommended to ensure
compatibility, quality and normal operation with your products. Please contact
your distributor for a list of certified components (eg. SFP, SFP+, HBA card,
iSCSI cable, FC cable, memory module, etc.).