EonNAS 1000 Series Hardware Manual
40
2. Adjust the length by loosening the four screws on the slide rail. Secure the slide
rails to front and rear posts using truss head screws. Tighten the four screws on the
slide to fix the length.
M5 x 9.0mm
05
M5 x 9.0mm
05
Inner glide rail
3. Attach inner glides to BOTH sides of the enclosure using flathead screws #6-32
(8)
#6-32
08
4. With the assistance of another person, lift and insert the enclosure onto the slide rail.
Make sure the inner glides on both sides of the enclosure meets the inner glide rail.
Secure the enclosure with M5 or M6 screws from the front.